DIVISION B BASE BID — NORTH MICHIGAN STREET
<br />Item No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit
<br />Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />$ 9,2%00
<br />$ 9,250.00
<br />2
<br />CPM Schedule
<br />1
<br />LS
<br />$ 500.00
<br />$ 500.00
<br />3
<br />CPM Schedule, Monthly
<br />6
<br />EACH
<br />$ 200.00
<br />$ 1,200.00
<br />4
<br />Maintaining Traffic
<br />1
<br />LS
<br />$ 5,523.00
<br />$ 5,523,00
<br />5
<br />Video Record
<br />1
<br />LS
<br />$ 4,000.00
<br />$ 4,000.00
<br />6
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$27,250.00
<br />$ 27,250.00
<br />7
<br />Clearing of Right of Way
<br />1
<br />LS
<br />$18,612.00
<br />$ 18,612.00
<br />8
<br />Additional (Common Excavation,
<br />Undistributed
<br />50
<br />CYS
<br />$ 175.00
<br />$ 8,750.00
<br />9
<br />Pavement Milling, Asphalt, Variable
<br />Depth
<br />530
<br />SYS
<br />$ 21.00
<br />$ 11,130.00
<br />10
<br />Brick Remove, Reset
<br />65
<br />SYS
<br />$ 117.00
<br />$ 7,605.00
<br />11
<br />Sidewalk, Concrete, Remove
<br />1235
<br />SYS
<br />$ 12.00
<br />$ 14,820.00
<br />12
<br />Curb, Concrete, Remove
<br />850
<br />LFT
<br />$ 15.00
<br />$ 12,750.00
<br />13
<br />Tree, Remove
<br />7
<br />EACH
<br />$ 300.00
<br />$ 2,100.00
<br />14
<br />Structure, Remove
<br />0
<br />EACH
<br />$ 5,000.00
<br />$
<br />16
<br />Wall Remove
<br />60
<br />LFT
<br />$ 15.00
<br />$ 900.00
<br />17
<br />Curb Wall, Remove
<br />530
<br />LFT
<br />$ 15.00
<br />$ 7,950.00
<br />18
<br />Lightpole & Foundation, Remove
<br />17
<br />EACH
<br />$ 250.00
<br />$ 4,250.00
<br />19
<br />Vault Repair — Morris Performing Art
<br />Center
<br />1
<br />LS
<br />$15,000.00
<br />$ 15,000.00
<br />20
<br />Temporary Erosion Control
<br />1
<br />LS
<br />$ 1,000.00
<br />$ 1,000.00
<br />21
<br />Temporary Inlet Protection
<br />7
<br />EACH
<br />$ 100.00
<br />$ 700.00
<br />22
<br />Inlet, Type B-15
<br />2
<br />EACH
<br />$ 3,465.00
<br />$ 6,930.00
<br />23
<br />Storm Sewer Pipe, 10 IN
<br />19
<br />LFT
<br />$ 154.00
<br />$ 2,926.00
<br />24
<br />Compacted Aggregate, No. 53
<br />134
<br />TON
<br />$ 24.00
<br />$ 3,216.00
<br />30
<br />HMA Base, Type B
<br />77
<br />TON
<br />$ 58.00
<br />$ 4,466.00
<br />31
<br />HMA Intermediate, Type B
<br />25
<br />TON
<br />$ 66.00
<br />$ 1,650.00
<br />32
<br />HMA Surface, Type B
<br />15
<br />TON
<br />$ 139.00
<br />$ 2,085.00
<br />25
<br />HMA Patching, Type B, Undistributed
<br />10
<br />TON
<br />$ 500.00
<br />$ 5,000.00
<br />26
<br />Standard Curb, Concrete
<br />890
<br />LFT
<br />$ 31.00
<br />$ 27,590.00
<br />27
<br />Sidewalk, Concrete, Reinforced, 5 IN
<br />1155
<br />SYS
<br />$ 52.00
<br />$ 60,060.00
<br />28
<br />Sidewalk, Decorative, Reinforced, 5IN
<br />500
<br />SYS
<br />$ 70.00
<br />$ 35,000.00
<br />29
<br />Concrete, PCCP, Reinforced, Plain, 10
<br />500
<br />SYS
<br />$ 74.00
<br />$ 37,000.00
<br />Addendum #2 � � � Ub1cCC M
<br />Version 4/5/2018 Contractor's Bid for Public Works -10