My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2018 Street and Sewer Dept Materials - Walsh & Kelly, Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - 2018 Street and Sewer Dept Materials - Walsh & Kelly, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 2:16:14 PM
Creation date
4/26/2018 9:12:40 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. List references from private firms for which you have performed work. <br />Gatlin Plumbing & Heating, Inc. I I I I E. Main St., Griffith, IN Ms. Clara Murphy <br />Gouj4h, Inc. 2200 E. 88`h Dr., Merrillville IN 46410 Mr. Raymond Gou h <br />Dyer Construction Co., 1716 Sheffield Avenue_,_ Dyer, IN Janet Furman <br />Grimmer Construction Co. Inc. 2619 Main Street Highland, IN Mr....Greg Grimmer <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />I . Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could <br />begin work, completed the project, number of workers, etc. and any other information which you believe would <br />enable the governmental unit consider your bid.) <br />As required by owner <br />2. Please list the names and addresses of all subcontractors (i,e, persons or firms outside your own firm who have <br />perfon-ned part of the work) that you have used on public works projects during the past five (5) years along with a <br />brief description of the work done by each subcontractor. <br />See Attached List <br />3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be <br />used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a <br />listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed <br />project, you are under a continuing obligation to immediately notify the governmental unit in the event that you <br />subsequently determine that you will use a subcontractor on the proposed project. <br />Will supply upon award of contract <br />4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors <br />may also be required to be listed by the governmental unit. <br />QUANTITY <br />ITEM <br />DESCRIPTION, <br />SIZE, CAPACITY, <br />ETC. <br />CONDITION <br />YEARS <br />OF <br />SERVICE <br />PRESENT LOCATION <br />5 <br />Asphalt Plants <br />Various <br />Good <br />Griffith, South Bend, <br />Valparaiso, Lowell, LaPorte, <br />18 <br />Asphalt Pavers <br />Various <br />Good <br />Griffith, South Bend <br />4 <br />Slipform Conc. Paver <br />Comm II <br />Good <br />Griffith, South Bend <br />3 <br />Road Widener <br />Various <br />Good <br />Griffith, South Bend <br />5 <br />Motor Graders <br />CAT/J.D. <br />Good <br />Griffith, South Bend <br />48 <br />Rollers <br />Various <br />Good <br />Griffith, South Bend <br />31 <br />Rubber Tire Loaders <br />Various <br />Good <br />Griffith, South Bend <br />15 <br />Excavators <br />Various <br />Good <br />Griffith, South Bend <br />8 <br />Bulldozers <br />Various <br />Good <br />Griffith, South Bend <br />6 <br />LowBoy Tractors <br />Various <br />Good <br />Griffith, South Bend <br />7 <br />Flatbed Dumps <br />Various <br />Good <br />Griffith, South Bend <br />39 <br />%2 and Y4 ton Pickups <br />Various <br />Good <br />Griffith, South Bend <br />59 <br />1 Ton Crew Trucks <br />Various <br />Good <br />Griffith, South Bend <br />3 <br />Cold Planers <br />W irtgen 1900 <br />DC <br />Good <br />Griffith, South Bend <br />3 <br />Tri-Axle Dump <br />Mack <br />Good <br />South Bend <br />5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing <br />your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed. <br />Yes, we received quotes from potential subcontractors and suppliers <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.