CONSTRUCTION BOND {
<br />Know on wen by Ahese presets. ,That we. ._...'_Tht...h�.
<br />of the, county of...0 ook State of N ` gpt
<br />pat, and, Unite S tes Fidelity and GuarsaLy C..°xs..,........„
<br />-"-
<br />of the "Xxx B ----.and State c►f.=...:.........a �X.�iii�., 9�
<br />as sureties, are held and firmly booed to the City of South i3end, Indiana, in the ettsa
<br />H1xe hundred eighi,y-nine----------_------•-_-_ (#� 4>,989.OQ3
<br />for the payment of which, weft and truly to be made, we jointly and `seV6raHy bind our" y4h our- beltif
<br />executors, adminstrators and assigns, firmly by, these presents.
<br />The cmditions of the obligation are such that if the -.above named....,.. „.,.....�„ . r.r� r�erffest.ussr�tsca:;-
<br />�tbiLB-'--C-ergs.Lruci.io�_-Ce�ja]ty._---- sr -a i ia.th u,.5u,ua cuutrae:,
<br />made and entered info the ---------------- _.?- 2jjdr---------- ----- dap oi_ = 1 3y 3r.... ..........--..., 19....�._
<br />with°'the Cityoi South 'er_�, ;ndian� and shall f__ - a1Pth- .onditions'-anti stipulations therein contained,
<br />according'w the true intent :_u' mea�:a:g th= reof, in all Yost,- -ts, then this Aligatton to be void, otherwise,
<br />to be and remain in fall force "and virtue in law. -,In the eve. the said City sliall extend, the time for the ,
<br />coxngletion of said work, such extension shall not in any way release the sureties on this bond:
<br />This shall be a construction bond, and the sureties on the same shall not be held responsible for the
<br />maintenance and repair of the improvement after it has been accepted by bhe second patty; but such sureties
<br />shall be held responsible for the faith4'ul compliance with all other conditions, stipulations. and requirements
<br />Covered by or set out in the contract.
<br />4ti P'N " S rjurhands .d .
<br />a d peals tlr ... .._. a of.. I&M A9?��......._..----., l9
<br />United States FideVity sn G .... m
<br />B � m D®r ..g _ ..•....(SEAL) THE WHITE CONSTRUCTION CO. }
<br />y t r..... - J: ` H1J"itl;I (tiEAL
<br />..A��a�ae�r•--�a=..fact..«
<br />The, above fiorrdt afilr ogedl this.................22ad . ch
<br />.Zi....,,�.„iU, 0TER
<br />L. P. HARDY..
<br />Board of Parm lywu
<br />Bids beiag advertised for this 22ad. day. of May 1923 and no bids
<br />were received on the- following improvements.
<br />Grade, curb aad ,walk on California Ave, from Lawada le Ave to Sancome
<br />Grade, curb and walk on High Street from Bow it St. to Calvert St.
<br />Grade,- curb and walk on Joht#soa St. from Humboldt to Elwood Ave.
<br />Grade, curb and walk on Clyde St. from Ind. Ave. to Ewing Ave.
<br />Grade,, curb and walk . OR Roberts St. from Mishawaka Ave : to Ruskin
<br />Grade, curb mad walk ea Eldora Ct. from L. W4P E, to end of Eldora Ct.
<br />Grade.,,curb and walk aa:McCartaey St, from Portage.Ave. to Allen St.
<br />Grade curb and walk on Bowmz St. from Kline St. to Sampson St.
<br />Grade curb and walk on Dayton St. from Alley W.. of Kline St, to
<br />the west line of Robinson's tad. Add.
<br />Sidewalk on Madera St. from Keller St. to S.'line of Morris Park Add.
<br />C-ride, curb,and walk on Randolph St. from Leer St. to 1st. alley west.
<br />Claims were approved as follows:-
<br />W. D..Teeple Refund Bldg. Permit $2.00
<br />United ,Ste tes Blue Print 4.90
<br />Bauth Bead Tribune 42.99
<br />Garbage Dept. 646.20
<br />Street & Alley 1909.90
<br />Street Repair Dept., . 757.20
<br />Engineering Dept., 766.87
<br />Cemetery, Dept., 283.10
<br />Attestedt-
<br />er of Me- Boa—r-C17.
<br />Pres eat.
<br />
|