Laserfiche WebLink
I <br />GRADE CURB AND WALK ON EANDOLPH STREET. <br />Bid of <br />Jesse A, 'Barnes'. <br />Walk per sq. ft..18 <br />Curb per tin ft. <br />.45 <br />Grading per cu. yd... <br />.75 <br />Grade curb and walk-on Elwood Avenue. <br />Bid of <br />H. L. Davis, <br />Walk per eq. fti. <br />.18 <br />Curb per lin ft. <br />.45 <br />grading per cu. yo• <br />•75 <br />PAVEMENT ON HUSY STREET. <br />Bid. of <br />White Construction Company. <br />Walk per sq. ft. <br />.20 <br />Curb per Ila ft. <br />.50 <br />Grading per cu. yd. <br />1.00 <br />Sheet asphalt Trinidad per sq. yd. <br />2.79 <br />Sheet asphalt Mexican per sq. yd. <br />2.64 <br />Asphaltic concrete Mexican per sq. yd. <br />2.39 <br />Asphaltic concrete Trinidad per sq. yet. <br />2.s4 <br />8 inch conduit pipe per lint ft. <br />.1.00 <br />Manholes covers, each asset, <br />3.00 <br />Inlets reset, cash' <br />3.00 <br />Storm water inlets Beset each <br />13.00 <br />Marginil curb per lin ft. <br />.40 <br />Bid of <br />Williston Construction Compani. <br />Walk per sq. ft. <br />20 <br />Curb per Ila ft. <br />.50 <br />Grading per cu, yd. <br />1.00 <br />Sheet asphalt Trinidad per sq. yd. <br />3.02 <br />Sheet asphalt, Mexican per sq. yd. <br />2.84 <br />7 inch concrete pavement per sq. yd. <br />2.35 <br />• 3 inch brick do gravel base sand - filler <br />• per sq.-yd. <br />2.55 <br />•3,inch brick on gravel base and asphalt <br />• filler per sq. yd. <br />2.70 <br />Asphaltic concrete Mexican per sq. yd. <br />2.54 <br />-Asphaltic concrete Trinidad per sq. yd. <br />2.'70 <br />• 8 inch - conduit pipe per Ila ft. <br />1.00 <br />-Storm water inlets, each <br />12.50 <br />• Margined curb per lin ft. <br />.40 <br />-Resetting-inlets, each <br />3.00 <br />-Resetting manhole -covers, each <br />3.00 <br />• Check $202.00 <br />Bid of <br />Hoban & Roach <br />Walk per sq. ft. no bid. <br />Curbing per lin ft. $.40 <br />Grading per cu. yd. 1.00 <br />7 inch concrete pavement per sq. yd. 2.45 <br />8 inch conduit pipe per lin ft., .go <br />Storm water inlets, each .15.00 <br />Resetting inlets, each 3.00 <br />Resetting manhole covers, each 3.00 <br />Bid of Plummer Construction (;®mpgeny. <br />Walk per sq. ft. .25 <br />Curb per lin ft.. .50 <br />Gradin per cu. yd. 1.00 <br />-Three fl")Inch brick.pavement using <br />vertical fibre brick with land filler <br />er s 55 <br />3 lack vertieial fibre brick pavementyd. 2. <br />with asphalt, finer per sq. yd $2.75 <br />8 inch conduit pipe per lin ft. .70 <br />Stem water inlets, each 35.00 <br />Marginal curb per lit ft. _ .35 <br />Resetting inlets, each 12.00 <br />Resetting manhole covers, each 12•00._ <br />