Laserfiche WebLink
213 <br />Tuesday May I5th.: 1923. Centlaued.` <br />2esurfaciag sdd paving of Notre Dome Avenue from Jefferson Blvd. <br />to City Limits. <br />Bid of White Construction Co. <br />Walk per sq. ft. <br />0.20 <br />Curb per Ila ft.-- <br />,50 <br />Br4ding per cu, yd. <br />1.05 <br />Trinidad sheet asphalt per sq. yd. <br />2.97 <br />Mexiass sheet asphalt, per sq. yd, <br />282 <br />TrIsidad asphaltiq concrete per sq. yd. <br />2.67 <br />Mexican asphaltie conereto per s j. Ott <br />2.52 <br />Resurfacing-With,Maxlean sheet asphalt per sq. <br />yd. $1.90 <br />Resurfacing with'Mexican asphaltic concrete <br />pavt*st per sq. yd. <br />1.60 <br />Resurfacing with Trinidad asphaltic concrete <br />pavement per sq. yd. <br />1.75 <br />Brick in street car track with one inch cushion <br />filler per sq. yd, <br />2.62 <br />'Relaying brick isi gutters, per sq. yd. <br />.75 <br />9 each ceaduit pipe, per. Ila ft. <br />1.00 <br />Marginal curb=per Ila ft. <br />.40 <br />Resetting, inleta, each <br />3.00 <br />gesettiag maahole covers, each <br />3.00 <br />Storm water inlets, eaek <br />13.00 <br />Bid of Grace Construction Company. , <br />Walk per'sq. ft. <br />118 <br />Cprb per Ina ft. <br />,50 <br />Gradiag per cu. yd. <br />150 <br />Trinidad: shoot asphalt per sq. yd. <br />3.08 <br />Mexican sheet asphalt per sq. yd, <br />2.77 <br />Next4*4adaaphaltic concrete per sq. yd. <br />2.62 <br />Trinidad rssphaltic concrete per 34, yd. <br />2.-n <br />Resurfacing with Trinidad S. Aopkalt per sq, yd 2.11 <br />Resurfscing with Mexican Shoot asphalt per sq <br />yd 1,93 <br />Resurfacing with Mexican asphaltic concrete <br />per sq, yd. <br />467 <br />Resurfacing with Trinidad asphaltic concrete <br />per sq, yd. <br />1.82 <br />$rink in street car tracks with 1" sand cushion <br />per sq, yd. <br />2.50 <br />Relaying brick is gutters, per sq. yd. <br />1.10 <br />8 inch conduit pipe per Inn ft. <br />1.25 <br />_ Marginal curb per list ft, <br />.30 <br />Storm wager inlets, sack <br />15.00 <br />Resetting inlets, each <br />9.00 <br />Resetting manholes covers, each <br />5.00 <br />Bid of Williston Construction Company. <br />Walk per sq. ft. ,20 <br />Curb per Inn ft. .60 <br />Grading per cu, yd, 1,25 <br />Trinidad Sheet asphalt per sq. yd, 2.93 <br />Mexican Sheet asphalt, per sq, yd. 1." <br />Triaidad asphaltic concrete per sq. yd, 2:61 <br />Mexican asphaitic concrete per sq. yd. 2,45 <br />Resurfacing wiTh Trinidad sheet asphalt <br />per sq. yd. <br />2.08 <br />Resurfacing with Mexican Sheeb asphalt <br />per sq. yd. <br />1.58 <br />Resurfaeiag with Mexican asphaltic concrete <br />per sq, yd. <br />2.61 <br />Resurfacing WIVU Trui an asphaltic concrete <br />per sq, yd. <br />1,74 <br />Brick is street car track one inch sand cushion <br />per sq. yd. <br />2.75 <br />Relaying brick in gutters per sq. yd.. <br />1.00 <br />8 lack conduit pipe per -Ina ft. <br />1.00 <br />Storm water inlets, each <br />14.50 <br />Resetting ialets, each <br />7.50 <br />Resetting manholes covers, each <br />7.50 <br />