9�E1
<br />Tuesday Wy 15th., 1923. Continued,
<br />Pavement on St. Peter Street bids continued,
<br />Bld of Grace Construction Company.
<br />> curb per tin ft. v
<br />> Grading per cu. yd,
<br />Trinidad Shoot asphalt per sq..yd.
<br />Mexican Shoot asphalt pr sq,yd:
<br />Trinidad asphaltic concrete per sq, yd,
<br />Mexican,asphaltic conerete:per sq. yd.
<br />Marginal curb per lln ft.
<br />8 inch conduit pipe per lilt ft.
<br />Sterne water, inlets, each
<br />Resetting inlets, each
<br />Resetting manhole covers, each
<br />Manholes per ft.
<br />Manhole tops each
<br />C50
<br />1.00
<br />3,08
<br />2.97
<br />2.77
<br />2.62
<br />.40
<br />1.25
<br />15.00
<br />5.00
<br />5.00
<br />25.00
<br />10i00
<br />Bid of R.eith-rRiley
<br />Walk per sq ft.
<br />.20
<br />curb per 1 ih ft.-
<br />.50
<br />Grading per cu • yd •
<br />1.00
<br />Sheet asphalt Mdxicax per sq. yd.
<br />2.75
<br />Krinidad sheet, asphalt per sq, yd.
<br />2.95
<br />Trinidad asphalt is concrete per sq,
<br />yd,
<br />2.65
<br />Mexican asphaltic concrete per sq.
<br />yd.
<br />2,45
<br />Marginal curb per l in ft.-
<br />.45
<br />8 inch conduit pipe per iin ft.
<br />.85
<br />Storm waor inlets, each
<br />12.00
<br />Resetting inlets, each
<br />3.00
<br />Resetting maahele each
<br />3.00
<br />Manholes per ft.
<br />8.00.
<br />Manholes curbs axd.covers, each
<br />22.00
<br />Certified check for
<br />$19144#0.0
<br />Pavement on Ohio Street.
<br />Bid of Williston Construction Company. ,
<br />walk pier, sq. ft.
<br />$ .20
<br />.curb per lin. ft,,
<br />.60
<br />. Grading, per. cu. yd.
<br />1.00
<br />Mexican sheet asphalt per sq, yd.
<br />2.e7
<br />.Trinidad sheet asphalt per sq. yd.
<br />3.05
<br />.Mexican asphaltic concrete per sq.
<br />yd,
<br />2.57
<br />Triaiad asphaltic concrete per sq.
<br />yC
<br />2.73
<br />18 inch conduit pipe per lis ft,
<br />1.00
<br />Storm water inlets, each
<br />14.50
<br />Marginal curb per Ila ft.
<br />,4p
<br />Resetting inlets, each
<br />3.00
<br />•Resetting manhole covers, each
<br />3.00
<br />Manholes per ft, •
<br />12.50
<br />Manhole tops each
<br />20.00
<br />Bid of White Construction Co.
<br />-walk per sq, ft,
<br />.20
<br />-curb per Zia ft.
<br />.50
<br />Grading per cu. yd.
<br />1,05
<br />Mexican sheet asphalt per sq. yd.
<br />2.82
<br />Triaiad Sheet asphalt per sq.-yd,
<br />2.97
<br />Mexican asphaltic concrete per•sq.,yd.
<br />2,52
<br />•Trinidad asphaltic concrete per sq.
<br />yd.
<br />2.67
<br />.8 inch conduit pipe per lin,ft.,
<br />1.00
<br />Storm water inlets, eoeh
<br />13.00
<br />Margins curb, per, lix ft.
<br />.40
<br />.Resetting inlets, each
<br />3.00
<br />Resetting manhole each
<br />3.00
<br />.Manholes per ft.
<br />12.00
<br />>Manhole tops, each
<br />20,00
<br />
|