My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/17/1923 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1923
>
04/17/1923 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 10:45:32 AM
Creation date
4/12/2018 2:38:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/17/1923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board met in regular session at 9:00 A.M. All members present. <br />Bids were received opened and read on the following improvements. <br />PIPE SEWER ON CALIFORNIA AVENUE FROM LAWNNDALE .AVENUE TO SAN,COME AVIE. <br />Bid of Gerald McGillicuddy " <br />12 inch sewer per lin ft.... $2.60 <br />8 inch sewer per lin ft. .80 <br />6 inch sewer per lin ft. 1.20 <br />Manholes per ft. in depth 8.00 <br />Inlets, each 10.00 <br />Ma►ncholes curbs and covers, each 18.00 <br />Bid of Hoban & Roach <br />12 inch seweR per lin ft. 3.15 <br />8 inch sewer per lin ft. 1.00 <br />6 inch sewer per lin ft, 1.25 <br />Manholes per ft. 8.00 <br />Mancholes curbs and covers, each 20.00 <br />Storm water inlets each 13.00 <br />Bid of L. H. Webster <br />12 inch sewer per lin ft. <br />3.40 <br />8 inch sewer per lin ft. <br />1.00 <br />• 6 inch sewer per lin ft. <br />1.00 <br />a Manholes per ft. " <br />6.00 <br />Manholes curbs and covers, <br />each <br />18.00 <br />Storm water inlets each <br />10.00 <br />" Pipe sewer on Sancome Avenue from <br />California Ave. to Van Buren St. <br />Biel of Gerald McGillicuddy <br />12 inch pine sewer per lin <br />ft. <br />02.60 <br />10 inch " per lin <br />ft, <br />2.40 <br />8 inch "' " per lin <br />ft. <br />..80 <br />• 6 inch " " per lin <br />ft. <br />1.20 <br />Manholes per ft. <br />8.00 <br />° Storm water inlets; each <br />10.00 <br />Manholes curbs and'covers, <br />each <br />8.00 <br />Bid of Hoban & Roach. <br />Bid of L. H. Webster. <br />Bid of L. H. Webster, <br />12 inch sewer per lin ft. <br />10 inch sewer per lin ft. <br />8 inch sewer per lin ft. <br />6 inch sewer per lin ft, <br />" <br />Manholesper lin ft, <br />Storm water inlets, each <br />Manholes curbs and covers, each <br />12 inch sewer <br />per lin <br />ft., <br />10 inch sewer <br />per lin <br />ft. <br />8 inch sewer <br />per lin <br />ft. <br />6 inch sewer <br />per lin <br />ft. <br />Manholes per <br />ft. <br />Storm water <br />inlets, each <br />Manholes curbs and covers, each <br />3.85 <br />3.75 <br />1.00 <br />1.25 <br />8.00 <br />13.00 <br />20.00 <br />3.00 <br />2.80 <br />1.00 <br />1.00 <br />8.00 <br />18.00 <br />10.00 <br />" <br />PIPE SEWER ON MARINE STREET FROM CALVERT TV. TO BOWMAN ST. <br />12 inch sewer per lin ft. $3.00 <br />Manholes per ft. 5.00 <br />Inlets, each 5.00 <br />6to Manholes curbs and covers, each 10.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.