My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-2011 Data center to launch at Ignition Park
sbend
>
Public
>
News Releases
>
2011
>
02-09-2011 Data center to launch at Ignition Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2011 10:07:00 AM
Creation date
2/9/2011 10:06:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Since 2000, the City of South Bend has demolished old, abandoned buildings in the <br />former Studebaker Corridor in the state’s most aggressive brownfield reclamation effort. <br />Demolition began in January on the last two Studebaker buildings remaining in the 140 <br />acres planned for Ignition Park – the former Studebaker engineering building (the <br />previous home of Studebaker Auto Parts Corp.) and the Studebaker foundry (the former <br />Underground Pipe and Valve building). <br /> <br />As demolition proceeds throughout 2011 across the Ignition Park campus, construction <br />will begin on an estimated $20-million facility for Data Realty, not counting equipment. <br /> <br />Data Realty expects to create 14 full-time positions when the facility first opens, <br />expanding to as many as 30 employees over time. <br /> <br />“We are positioning South Bend for the next wave of computing,” said Rich Carlton, <br />president and chief operating officer of Data Realty. “Ignition Park offers substantial <br />electric power, redundancy and reliability with the Metronet’s infrastructure, and an <br />opportunity to create a green data center that gives us a competitive edge.” <br /> <br />The City’s Redevelopment Commission will work in partnership with Data Realty to help <br />the data center meet architectural and design standards for Ignition Park, including a <br />LEED (Leadership in Energy and Environmental Design) designation. City officials and <br />Data Realty are collaborating to create a unique energy exchange partnership with <br />Transpo’s adjacent LEED Platinum transit facility, the first public building in Ignition <br />Park. Transpo’s geothermal system would provide some of the base cooling capacity for <br />the data center as exhaust heat from Data Realty’s servers would provide supplemental <br />heat for Transpo. <br /> <br />“This sharing is an innovative approach that saves energy, helps the environment and <br />reduces our carbon footprint,” Luecke said. <br /> <br />A Tier III data center, like Data Realty’s, is the second most stringent class of data center. <br />Levels are defined by the Uptime Institute, a Santa Fe, N.M.,-based think tank. <br /> <br />Ignition Park, together with the 12-acre Innovation Park next to the University of Notre <br />Dame campus, constitutes South Bend’s dual-site, state-certified technology park. <br />Originally designated with 83 acres, Ignition Park is being expanded by City planners to <br />incorporate as many as 140 acres of developable land near downtown South Bend. <br />Located on the former grounds of legendary automaker Studebaker Corp., Ignition Park <br />seeks to attract a variety of innovative companies, especially high-tech and research- <br />based businesses. Some ventures under development at Innovation Park at Notre Dame <br />are expected to put down roots and grow at Ignition Park. <br /> <br />Ignition Park is generally bounded by Sample Street on the north, Lafayette Boulevard on <br />the east, Indiana Avenue on the south and Chapin Street/Prairie Avenue on the west. <br /> <br /># # # <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.