My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6H(2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
02-08-11 Packet
>
6H(2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2011 1:31:42 PM
Creation date
2/4/2011 1:31:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHRISTOPHER B. BURKE ENGINEERING, LTD. <br />220 West Cottax Avenue Suite 500 South Bend, IN 46601 TEL (574) 282-8001 FAX (574) 282-8003 <br />August 3, 2010 <br />Bill Schalliol <br />City of South Bend <br />Division of Economic Development <br />12'h Floor County-City Building <br />South Bend, IN 46601 <br />Subject: Ireland & Miami Corridor (mprovements <br />Professional Services Proposal <br />Dear Mr. Schalliol: <br />Christopher B. Burke Engineering, Ltd (CBBEL) is pleased to provide this proposal for <br />professional engineering and planning services related to the Ireland and Miami Corridor <br />improvements in the City of South Bend. The following is our understanding of the <br />assignment, scope of services, and estimated fee in support of the project. <br />UNDERSTANDING OF THE ASSIGNMENT <br />CBBEL understands that the City is seeking assistance in the development of a Corridor <br />Improvement project along portions of Ireland Road and Miami Street that will include an <br />intersection improvement design at High Street and Ireland Road, and the addition of <br />sidewalks, amulti-use path, and street lighting along Ireland Road between Miami Street <br />and Fellows Street and sidewalk on Miami Street between Alpine and Ireland. In addition, <br />the City is looking for parking fat design concepts for the Erskine Golf Course. The project is <br />being proposed by the City as a means to reduce traffic congestion at the High and Ireland <br />intersection while also improving pedestrian access and general street lighting along the <br />corridor. <br />SCOPE OF SERVICES <br />Task 1 -Survey: <br />A topographic survey to supplement existing data for the project area is anticipated to be <br />performed by a sub consultant. A utility locate with relevant utilities will be conducted so the <br />utilities are included in the survey. CBBEL will coordinate the design with utilities. <br />Christopher B. Burke Engineering Ltd. City of South Bend: Ireland and Miaml Corridor Improvements <br />01.P100167.00000 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.