Laserfiche WebLink
REGULAR MEETING ..JANUARY 10, 2011 7 <br />$2,316,315.63 listed, so this is a revised total amount the Board was approving today. Upon a <br />motion made by Mr. Inks, seconded by Mr. Littrell and carried, the revised Change Order was <br />approved. <br />APPROVE CHANGE ORDER NO. 3 — BLOWER NOS. 1A & 1B — PROJECT NO. 109 -074 <br />(SEWER BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br />of Bowen Engineering Corp., I I10 Arrowhead Court, Crown Point, Indiana, 46307, indicating <br />the Contract amount be increased by $7,962.29 for a new Contract sum, including this Change <br />Order, in the amount of $2,183,725.29. Upon a motion made by Mr. Inks, seconded by Mr. <br />Littrell and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 2 — PROCUREMENT OF MISCELLANEOUS WATER <br />FITTINGS — PROJECT NO. 109 -066 (SRF) <br />Mr. Gilot advised that Mr. Dave Tungate, Water Works, has submitted Change Order No. 2 on <br />behalf of Underground Pipe and Valve, 1100 Prairie Avenue, South Bend, Indiana 46601, <br />indicating the Contract amount be increased by $1,658.62 for a new Contract sum, including this <br />Change Order, in the amount of $68,970.47. Upon a motion made by Mr. Littrell, seconded by <br />Mr. Inks and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 4 FINAL AND PROJECT COMPLETION AFFIDAVIT <br />— KENNEDY PARK SEWER SEPARATION — PROJECT NO. 109 -003 2007B SEWER <br />BOND <br />Mr. Gilot advised that Mr. Toy Villa has submitted Change Order No. 4 (Final) on behalf of <br />C &E Excavating, Inc. indicating the contract amount be decreased by $188,090.90 for a new <br />contract sum, including this Change Order, of $3,132,391.85. Additionally submitted was the <br />Project Completion Affidavit indicating this new final cost of $3,132,391.85. Upon a motion <br />made by Mr. Inks, seconded by Mr. Littrell and carried, Change Order No. 4 (Final) and the <br />Project Completion Affidavit were approved. <br />APPROVE CERTIFICATE OF SUBSTANTIAL COMPLETION — RAW PUMP NO. I <br />UPGRADE — PROJECT NO. 109 -039 (SEWER BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Certificate of Substantial <br />Completion on behalf of Thieneman Construction, Inc., 3313 East 83`d Place, Merrillville, <br />Indiana 46410, for the above referenced project, indicating a substantial completion date of <br />November 8, 2010. Upon a motion made by Mr. Inks, seconded by Mr. Littrell and carried, the <br />Certificate of Substantial Completion was approved. <br />APPROVE CERTIFICATE OF SUBSTANTIAL COMPLETION — BARTLETT STREET <br />PARKING STRUCTURE FACADE RENOVATION — PROJECT NO. 110 -027 (MEDICAL <br />MF <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Certificate of Substantial <br />Completion on behalf of Ziolkowski Construction, Inc., 1005 South Lafayette Blvd., South <br />Bend, Indiana, for the above referenced project, indicating a substantial completion date of <br />November 30, 2010. Upon a motion made by Mr. Gilot, seconded by Mr. Littrell and carried, the <br />Certificate of Substantial Completion was approved. <br />APPROVE CERTIFICATE OF SUBSTANTIAL COMPLETION II — EMBEDDED SENSOR <br />PHASE 11— PROJECT NO. 109 -019 (SEWER BOND) <br />Mr. Gilot advised that Ms. Thia Vawter, Engineering, has submitted the Certificate of <br />Substantial Completion II on behalf of HRP Construction, Inc., PO Box 266, South Bend, <br />Indiana 46624, for the above referenced project, indicating a substantial completion date of <br />November 19, 2010. Upon a motion made by Mr. Inks, seconded by Mr. Littrell and carried, the <br />Certificate of Substantial Completion was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — JEFFERSON BOULEVARD & <br />WAYNE STREET ELECTRICAL OUTLET REPAIRS — PROJECT NO. 110 -068 SBCDA <br />TF <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Concord Electric, 30753 Old US 20, Elkhart, Indiana 46514, for the above <br />referenced project, indicating a final cost of $8,843.00. Upon a motion made by Mr. Littrell, <br />seconded by Mr. Inks and carried, the Project Completion Affidavit was approved. <br />