My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(4) & (5)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
01-14-11 Packet
>
6B(4) & (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2011 2:51:36 PM
Creation date
1/11/2011 2:51:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~n~art ~l ctric 21~lotor R~~air <br />Rewinding and Repairing of Electric Motors -Commercial -Industrial -Domestic <br />122 East Sample Street South Bend, IN 46601 <br />Phone: 574.288.4731 Fax: 574.282.4860 <br />City of South Bend Redevolpment Commission: December 22, 2010 <br />Regarding: <br />Relocation Of Enyart Electric Motor Repair <br />to 1313 Prairie Avenue <br />1) For AEP to bring in a 3 phase power drop & termiate inside the <br />building to per-determined wall location at N.W corner No Charge! <br />2) A) Contractor charges to renovate the existing offices to include <br />service conter area, 2 offices, environmental controlled <br />motor rewinding room (as we currently have), break room <br />including the modernization of the building front for curb <br />appeal and function. <br />B) 35' X 40' deep bay Building <br />addition to house our existing crane :including necessary <br />demolition, disposal, steel & cement as described. <br />***see attached*** (Ancon Construction $128.850.00) <br />***see attached*( Ziolkowski Constructiion $144,718.00) <br />Lower of 2 quotes $128,850.00 <br />3) Contractor to furnish labor & material to hook up and distribute <br />480 volt 3 phase to equipment (see Tri-City Data & Electric) $ 53,149.00 <br />4) To remove, crate, transport, install & hook up to new service <br />our existing step-down transformers & power supplies for <br />220 Volt 3 phase as required. (Enyarts to do this) $ 2,240 .00 <br />5) Material Costs needed to install and distribute electricity to <br />machines (conduit, Load Center, single phase Transformer <br />5 disconnects & conduit connectors (Tri City Data. & Electric) $ 15679.00 <br />6) Labor & material to plumb the building for compressed Air <br />(See attached from D.A. Dodd) $ 9,738.00 <br />7) Replace the Carpet in the office area after the partitions are <br />altered. 16.82/sq yd (The Carpet Shop) $ 2,792.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.