My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
12-17-10 Packet
>
6B(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2010 2:57:06 PM
Creation date
12/14/2010 2:57:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the City's choosing. CBBEL will address contractor questions and prepare and issue <br />addenda. Following bid opening, CBBEL will compile and certify bid tabulation sheets <br />and provide a contract award recommendation to the Owner. It is assumed that City <br />staff or representatives will coordinate the bid collection, bid opening, and the <br />preparation of the construction agreement. <br />Task 4 -Construction Observation Services <br />Pre-Construction Conference <br />Organize and set agenda for Conference <br />Notify representatives of the City, Contractor, and all utilities <br />Develop and distribute meeting minutes and sign-in sheet <br />Field Reports, Records, and Daily Work <br />For the purpose of this task, CBBEL staff have assumed a sixty (60) calendar day <br />construction period. CBBEL staff will provide part time construction observation for the <br />noted activities: <br />• Inform Contractor of observed deficiency in Contractor's work <br />• Complete a Daily Report for each day's work in the format desired by the City <br />and provide copies to the Bureau of Construction Manager. <br />• Collect and forward Certified Payrolls/Payroll Vouchers to the Bureau of <br />Construction Manager <br />Contractor Application for Payment <br />• Review and agree to pay quantities with Contractor prior to submitting <br />applications for payment <br />• Check Contractor's applications for payment, sign and transmit payment <br />applications to the Bureau of Construction Manager. <br />Change Orders <br />CBBEL staff will coordinate and process change orders in a format acceptable <br />to the City of South Bend. <br />Project Close-Out <br />• Prepare a preliminary Punch List <br />• Conduct a Punch List Project Walk-through with the City <br />• Prepare and transmit a Final Project Punch List to the Contractor <br />• Verify completion of Punch List items <br />• Assemble Final Project Files and Documents <br />• Review Final Application for Payment and prepare Final Change Order <br />Christopher B. Burke Engineering Ltd. City of South Bend: Demolition of 1503 / 1505 Prairie Avenue <br />P01.100544.00000 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.