My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Minutes12-03-10 Meeting
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
12-17-10 Packet
>
2 Minutes12-03-10 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2010 3:29:11 PM
Creation date
12/14/2010 2:52:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting –December 3, 2010 <br /> <br />tenants that are interested. It is a Certified <br />Technology Park. The crucial word is <br />technology. When we’ve developed <br />buildings in the past there was an <br />architectural firm, and they passed their <br />designs to an engineering firm. The <br />engineering firm did the work on top of the <br />architectural work. As buildings require <br />much greater advanced technological <br />components, as we hope they will at Ignition <br />Park, it is crucial that those two things, the <br />engineering and the architecture merge and <br />develop in a cohesive manner. That means <br />we need a firm that has both architectural and <br />engineering capacity. BSA Life Structures is <br />such a firm. Based in Indianapolis, they <br />were started in 1975 and have 197 people on <br />staff. The Commissioners were provided <br />bios of many of the staff there. BSA’s work <br />is significant. They have done massive land <br />planning, medical, university, and technology <br />campus development, specifically, the <br />Stinson Remick Hall at Notre Dame and the <br />Indiana University Medical School building. <br />In the case of the IU Med School building, <br />Notre Dame required the use of its design <br />materials, though IU has half the budget of <br />Notre Dame. BSA accomplished that <br />building within IU’s budget. The University <br />of Notre Dame architectural staff couldn’t <br />praise BSA enough. <br /> <br />BSA has done very technical buildings for <br />medical facilities, education, research and <br />they’ve done incubator and accelerator <br />buildings. At some point we may need to <br />have that at Ignition Park. BSA has not only <br />worked for the end user, they have done <br />work for developers and for redevelopment <br />commissions. Staff recommends <br />Commission approval of the $65,500 <br />proposal for BSA Life Structures for the land <br /> 21 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.