My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-13-10 Council Agenda & Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2010
>
12-13-10 Council Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 12:44:58 PM
Creation date
12/9/2010 1:25:24 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ignition Park PUD Zoning Ordinance <br />Preliminary Plan <br />�v�s�d�. Not�eirnber 3; �b10 <br />Petitioner: <br />City of ,South Bend Redevelopment Commission <br />Introduction <br />Petitioner, City of South Bend Redevelopment Commission, requests the rezoning of <br />approximately 84 acres from the GI - General Industrial District to the PUD — Planned Unit <br />Development District to provide for a high tech industrial park to be known as Ignition Park. <br />Ignition Park is intended to be a launching pad for technological innovation. Ignition Park, in <br />combination with Innovation Park, creates a two -site, single, State Certified Technology Park <br />within the City of South Bend. It is anticipated that development within Ignition Park may include, <br />but not be limited to: research and development facilities; education; office; prototyping facilities; <br />and, support uses. <br />The land uses to be contained within Ignition Park shall be those set forth below for each category <br />identified on the Master Plan fled with this PUD petition. It is acknowledged that the Master Plan <br />filed with this PUD petition for Ignition Park recommends general land uses for real estate which <br />is not subject to rezoning at this time and that the final development of Ignition Park in substantial <br />compliance with the Master Plan will be subject to Petitioner's ability to obtain zoning and <br />development rights to such additional real estate in the future. The Master Plan does, however, <br />provide a framework from which to review the land use pattern proposed for Ignition Park in much <br />the same way as a Comprehensive Plan identifies land use patterns for a community as a whole. <br />The Master Plan vision for Ignition Park is to provide for a campus -like setting within a single <br />multi -use PUD District. The primary objective of this PUD District is to encourage development <br />which achieves a high degree of: (i) excellence in overall site design; (ii) integration of individual <br />parcel site design within the overall development; and, (iii) innovation, creativity and quality in <br />building design. The PUD District provides flexibility and procedural economy by permitting a <br />broad range of high -tech industrial land uses and related support uses in a single district, while <br />maintaining adequate land use controls to protect adjoining properties. <br />In order to encourage innovative building and site designs capable of enhancing the quality of the <br />Ignition Park built environment, an applicant may propose alternate development standards for: <br />yards and building setbacks; use of minimum yards and residential bufferyards; maximum <br />building height; minimum building height; maximum gross floor area; parking; loading; <br />outdoor operations; architecture; landscaping; lighting; or, signs, subject to approval by an <br />Ignition Park Architectural Review Board and the Area Plan Commission. <br />Architectural Review Board and Executive Director approval is required to establish any land use <br />or development within the Ignition Park PUD. <br />BDDSO] 64080641 Draft Date: November 3, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.