My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/06/1978 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1978
>
11/06/1978 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2011 9:05:52 AM
Creation date
12/8/2010 11:52:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
11/6/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
300 <br />REGULAR MEETING <br />NOVEMBER 6, 1978 <br />Contract No. 007 - Theater Lighting - Koontz - Wagner Electric Company <br />Change Order No. 2 - Add 8,930.00 - Installation of Theater Lighting <br />Systems (100 per cent by American <br />National Bank Lease <br />TOTAL - Add 8,920.00 <br />Contract No. 008 - Food Service Equipment - -Ruslander and Sons, Inc. <br />Change Order No. 2 - Deduct 91.68 - Reimbursement for additional work <br />in Kitchen for installation <br />Change Order No. 3 - Deduct 265.00 - Reimbursement for additional work <br />in Kitchen for installation <br />TOTAL - Deduct 356.68 <br />Contract No. 013 - Caulking - Harold J. Becker Co., Inc. <br />Change Order No. 1 - Add 3,761.36 - Caulking for exterior relief <br />angle not shown in original <br />TOTAL - Add 3,761.36 drawings. <br />Contract No. 014 - Hollow Metal Frames and Doors - Miller Steel <br />and Supply Company <br />Change Order No. 6 - Deduct 271.00 - Revisions to doors and frames <br />by No. 004 <br />Change Order No. 7 - Deduct 223.00 - Revisions to doors and frames <br />by No. 004 <br />Change Order No. 8 - Add 95.00 - Replacement of missing door <br />frame <br />- Add 727.13 - Additional frames in Art Center <br />(100 per cent by Art Center) <br />- Add 704.79 - Door revisions in Theater Area <br />to meet field conditions. <br />- Add 203.00 - Additional window frame for <br />Theater Control Room. <br />TOTAL - Add 1,235.92 <br />Contract No. 020 - Window Walls - Flour City Architectural Metals <br />Change Order No. 2 - Deduct 194.90 - Repainting of Window Wall <br />frames by No. 028 <br />Add 185.20 - Reworking of Window Walls <br />From No. 004 <br />TOTAL - Deduct 9.. 7.0 <br />Contract No. 021-- Ceilings, Furring, Plastering, Fireproofing <br />Gibson -Lewis Company <br />Change Order No. 10 - Add 4,810.00 - Miscellaneous modifications to <br />meet field conditions <br />TOTAL - Add 4,819.00 <br />Contract No. 022 - Carpet, Quarry Tile and Ceramic Interior Finishes <br />Change Order No. 6 - Add 265.00 - Repair of Tile in Kitchen for <br />Hook -up from No. 008. <br />TOTAL - Add 265.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.