My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/1979 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1979
>
08/20/1979 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 4:25:46 PM
Creation date
11/23/2010 1:28:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/20/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
168 <br />REGULAR MEETING <br />Arco Engineering Construction Co. <br />Mishawaka, Indiana <br />Bid - Sheet Piling - $245,000.00 <br />Bearing Piling $255,650.00 <br />AUGUST 20, 1979 <br />Bid was signed by William Reiff, <br />non - collusion affidavit was in <br />order and a 5% bid bond was submitted., <br />Ritschard Brothers, Inc. Bid was signed by Carmelo <br />South Bend, Indiana Ritschard, non - collusion affidavit <br />was in order and a 5% bid bond <br />was submitted. <br />Bid - Sheet Piling - $95,251.00 <br />Bearing Piling 102,414.00 <br />Combined Total Bid - $197,665.00 <br />Upon motion made by Mr. McMahon, seconded by Mr. Brunner and carried, <br />the bids were referred to the Engineering Department and the <br />Construction Manager for review and recommendation. <br />OPENING OF BIDS - CONCRETE IMPROVEMENTS <br />This was the date set for receiving bids for concrete improvements <br />in the 1100 block Echo Drive, intersection of Clayton and Eaton Drive, <br />intersection of Sample and Sheridan, island at the intersection of <br />York and Ireland Road and the repair of curbs on Miami Street, from <br />Eckman to Donmoyer. The Clerk tendered proofs of publication of <br />notice in the South Bend Tribune and the Tri- County.News which were <br />found to be sufficient. The following bids were opened and publicly <br />read: <br />Ziolkowski Construction Co <br />South Bend, Indiana <br />Bid - $62,375.25 <br />Murdock & Sons Construction Co. <br />South Bend, Indiana <br />Bid - $60,048.00 <br />McIntyre and Jones Const. Co <br />Mishawaka, Indiana <br />Bid - $64,286.98 <br />Rieth -Riley Construction Co. <br />South: Bend, Indiana <br />Bid - $56,706.30 <br />Bid was signed by Ben Ziolkowski, <br />non - collusion affidavit was in order <br />and a 5% bid bond was submitted. <br />Bid was signed by Calvin Murdock, <br />non - collusion affidavit was in order <br />and a 5% bid bond was submitted. <br />Bid was signed by Kenneth McIntyre, <br />non - collusion affidavit was in order <br />and a 5% bid bond was submitted, <br />Bid was signed by Richard Ruhlman, <br />non - collusion affidavit was in order <br />and a 5% bid bond was submitted. <br />Upon motion made by Mr. McMahon, seconded by Mr. Mullen and carried, <br />the bids were referred to the Division of Public Construction <br />for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.