My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/14/1979 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1979
>
05/14/1979 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 4:23:46 PM
Creation date
11/23/2010 12:39:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/14/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />50 <br />REGULAR MEETING <br />MAY 14, 1979 <br />A regular meeting of the Board of Public Works was convened at <br />9:30 a.m. on Monday, May 14, 1979 by President Patrick M. McMahon, <br />with Mr. McMahon, Mr. Brunner and Mr. Mullen present. Also in <br />attendance was Deputy City Attorney Terry Crone. <br />REVIEW OF MINUTES OF PREVIOUS MEETINGS <br />Mr. 11cMahon reported that he had reviewed the minutes of the regular <br />meeting of May 7 and he made a motion that the minutes be approved <br />as submitted. Mr. Brunner seconded the motion and it carried. <br />Mr. McMahon noted review of the minutes of a special meeting held <br />on May 1, 1979 to consider a booth application for River Bend Plaza <br />for a Nuclear Plant Moratorium Group. He made a motion to approve <br />the minutes of the meeting as submitted. Mr. Mullen seconded __ the <br />motion and it carried. <br />OPENING OF BIDS - MICHIGAN /MAIN CONNECTOR <br />This was the date set for receiving bids for the construction of <br />the Michigan /Main Connector. The Clerk tendered proofs of publica- <br />tion of notice in the South Bend Tribune and the Tri- County News <br />which were found to be sufficient. The following bids were opened <br />and publicly read: <br />Rieth- Riley_Construction Co. <br />South Bend, Indiana <br />Bid - 370,658.00 <br />Ziolkowski Construction Co. <br />South Bend, Indiana <br />Bid - $400,500.35 <br />Walsh & Kelly, Inc. <br />South Bend, Indiana <br />Bid .. $382,774.80 <br />Arco Engineering Const. Co. <br />South Bend, Indiana <br />Bid - $418,014.75 <br />LaFree Excavating Co. <br />Osceola, Indiana <br />Bid - $393,159.50 <br />Bid was signed by Chester Skwarcan, <br />non - collusion affidavit was in <br />order and a 5% bid bond was <br />submitted. <br />Bid was signed by Ben Ziolkowski, <br />non- collusion affidavit was in <br />order and a 5°% bid bond was <br />submitted. <br />Bid was signed by Thomas 0. <br />Walsh, non - collusion affidavit <br />was in order and a 5% bid bond <br />was submitted. <br />Bid was signed by William Reiff, <br />non- collusion affidavit was in <br />order and a 5% bid bond was <br />submitted. <br />Bid was signed by Richard LaFree, <br />non - collusion affidavit was in <br />order and a 5% bid bond was <br />submitted. <br />Upon motion made by Mr..11cMahon, seconded by Mr. Mullen and carried, <br />the bids were referred to the Bureau of Engineering for review and <br />recommendation. <br />[1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.