My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2010 Miami Street will re-open at the end of the work day on Monday, November 22, 2010
sbend
>
Public
>
News Releases
>
2010
>
11-19-2010 Miami Street will re-open at the end of the work day on Monday, November 22, 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2010 3:01:01 PM
Creation date
11/19/2010 3:00:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2. <br /> <br />Features: <br />? <br /> <br />Four lanes of concrete pavement 5,750 long with curbs and inlets <br />? <br /> <br />Drained by a 42" diameter storm sewer at the south end and an 18" diameter <br />storm sewer at the north end and in compliance with South Bend’s long-term <br />CSO (combined sewer overflow) control plan <br />? <br /> <br />5' wide sidewalks parallel the street on both sides <br />? <br /> <br />Lawn restoration using locally grown sod <br />? <br /> <br />25 street lights will line the project at completion <br />? <br /> <br />Reduced delays for turning vehicles <br /> <br /> <br />- 30 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.