My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(1) Professional Services Agreement
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
11-19-10 Packet
>
6C(1) Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 9:17:22 AM
Creation date
11/16/2010 3:52:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the boreholes /wells with bentonite once soil and groundwater sampling activities have <br />been completed. <br />Reporting <br />Upon receipt of the laboratory analyses, data will be reviewed and tabularized. <br />Comparison of the data for each respective chemical constituent will be made to the <br />Risk Integrated System of Closure (RISC) Default Closure Values for Residential and <br />Industrial /Commercial Properties. Upon completion of the initial data review, a "Letter <br />Report" will be prepared which presents the sample collection and analytical <br />methodologies used during the field phase of the assessment. Copies of the sample <br />location maps, tabulated data and comparison to RISC Default Closure Values will also <br />be incorporated. Recommendations for any additional assessment activities will be <br />made for review and comment. <br />SCHEDULE <br />PES proposes to commence site investigation activities within one week of receipt of <br />notification to proceed (depending on weather, utility clearance and Geoprobe <br />availability). Upon mobilization, we anticipate completion of the Geoprobe sampling <br />requiring one day. Laboratory analyses will be completed by Pace Analytical on <br />standard one -week turnaround from receipt by the laboratory. Our initial discussion of <br />results will occur within one day of receipt of laboratory analytical results. Our written <br />"Summary Letter Report" will be submitted within one -week of the initial conference. <br />COST ESTIMATE <br />An ESTIMATED COST for Phase II Environmental Assessment Services with respect to <br />the Baseline Environmental Assessment is presented as follows: <br />Field Engineering Services /Project Management <br />Geoprobe Rental (assumes 1 -day @ $1,400 /day, including mobilization) <br />Equipment Rental and Expendable Sampling Supplies <br />Laboratory Analysis: <br />4 soil samples for % Moisture @ $10 /sample <br />4 soil samples for analysis of VOCs @ $85 /sample <br />4 soil samples for TPH -ERO @ $50 /sample <br />4 soil samples for analysis of PAHs @ $85 /sample <br />3 groundwater samples for analysis of VOCs @ $85 /sample <br />3 groundwater samples for TPH -ERO @ $50 /sample <br />3 groundwater samples for analysis of PAHs @ $85 /sample <br />Terra Core Sampling Kits for collection of soil samples (15 kits @ $15 /kit) <br />Reporting <br />ESTIMATED COST <br />$ 900 <br />$1,400 <br />$ 200 <br />$ 40 <br />$ 340 <br />$ 200 <br />$ 340 <br />$ 255 <br />$ 150 <br />$ 255 <br />$ 225 <br />$1,000 <br />$5,305 <br />Please note that this ESTIMATED COST should be considered a Project Maximum, <br />which PES will not exceed without prior approval. However, should the scope of <br />services require modification (i.e., additional borings) based upon field conditions and /or <br />circumstances that would not have otherwise been anticipated, PES will notify the client <br />of such "changed conditions" and resultant cost implication to the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.