My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(1) Professional Services Agreement
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
11-19-10 Packet
>
6C(1) Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 9:17:22 AM
Creation date
11/16/2010 3:52:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2) The facility (122 E. Sample Street) was identified as a RCRA CESQG by the <br />regulatory database search, with waste streams identified as Not Defined (D000), <br />Ignitable Hazardous Wastes (D001) and Spent Non - halogenated solvents (F003). <br />Such wastes are generally the result of mixed wastes generated by two parts <br />washing basins containing mineral spirits. Such mineral spirits, as well as waste <br />oils generated on site, and received from off -site, are burned within an on -site <br />waste oil furnace. Overall, an estimated 200 - gallons of mineral spirits and 275 - <br />gallons are burned annually by the waste oil furnace, with introduction by an <br />aspirating (air compressor) system. The waste oil /solvent mix is stored within <br />aboveground storage tanks that are adjoining the furnace unit. As a result of <br />transfer operations and blow -down from the air compressor unit (aspirator), <br />significant staining of the concrete flooring was identified in the area of the waste <br />oil furnace. Some level of subsurface contamination may have resulted as a <br />result of the incidental releases associated with the waste oil furnace operations <br />(Recognized Environmental Condition). <br />3) Numerous floor drains were identified throughout the workshop area of the <br />building. Although attempts had been made to "close" several of the drains, there <br />remains some doubt as to how effective such closure was in sealing off potential <br />entry of waste oils and other potential contaminants. Other drains remained <br />operational and were located in areas of the building whereby the introduction of <br />waste oils and potentially solvents (i.e., mineral spirits) was possible. The <br />discharge point for drains is thought to be the municipal sanitary sewer <br />(unconfirmed); however the likelihood exists that at least one of the drains <br />(principally installed to facilitate the removal of snow melt) may discharge to the <br />on -site dry well located within the rear parking area of the facility. Staining of the <br />concrete in areas surrounding the floor drains was visually apparent. Based on <br />the aforementioned factors, the floor drains and the potential introduction of waste <br />oils and possibly solvents to the subsurface environment throughout 45 years of <br />motor repair service, is considered a Recognized Environmental Condition. <br />It should also be noted that the immediate area of the subject site has been the location <br />of significant industrial activity dating to the early 1900s, and that potential sources of <br />contamination in the immediate area of the subject site may not be fully delineated. As <br />such, the potential exists that as yet "undiscovered or unreported" releases may be <br />identified in the future (i.e. off -site sources). We also note that the chemical and physical <br />characteristics of the primary Contaminant of Concern (Tetrachloroethylene) for both the <br />Sibley Foundry and Ziker Cleaners Corrective Action Plan activities (north of site), to that <br />of waste oils and mineral spirits identified as being associated with historical Enyart <br />Electric Motor Repair operations, are distinctly different. Thus, the potential for on -site <br />environmental impact as a result of material handling activities conducted at the Enyart <br />Electric Motor Repair /Service facility cannot be discounted based solely on the <br />groundwater date from two nearby, off -site well locations installed during assessment of <br />Tetrachloroethylene associated with the Sibley Foundry and Ziker Cleaners. <br />Based upon the aforementioned, PES has recommended a Phase II Environmental Site <br />be undertaken for the purpose of assessment the extent to which, if any, the historical <br />activities have potentially impacted the subsurface environment. Accordingly, the <br />following sections present our approach toward conducting the Phase II Environmental <br />Site Assessment, projected costs and a tentative schedule for completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.