My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/10 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2010
>
10/25/10 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 3:56:52 PM
Creation date
11/9/2010 12:28:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />Five percent (10 %) Bid Bond was submitted <br />R <br />OCTOBER 25, 2010 320 <br />Year <br />Make/Model <br />Unit Price <br />2011 <br />Freightliner M2 with 2007 EPA Emissions <br />$141,512.00 <br />Option # <br />Description <br />Total <br />1 <br />Complete scale system. Vulcan Model R -206L or <br />equal. Unit to be 6 cell with set point controller to <br />support (2) 5 amp devices. <br />$6,500.00 <br />2 <br />20,000 lb capacity non -steer pusher axle, silent drive <br />Model AA -1455 or equal installed on unit. <br />$5,700.00 <br />RFID tags in refuse containers. <br />$51,420.00 <br />ALTERN <br />ATE <br />Hand held route optimization software and <br />2011 1 <br />Freightliner M2 with 2010 Emissions <br />$148,129.00 <br />Vulcan G -703 scale System <br />$(2,300.00) <br />Attorney Cheryl Greene informed the Board there was no bid bond present with the bid from <br />Kann Manufacturing. Mr. Gilot noted the Board allows twenty -four hours for the bidder to <br />produce the bid bond, and it must be dated prior to today's Board meeting to show the bond was <br />purchased with the intent to submit it with the bid. If Kann cannot produce a pre -dated bid bond <br />or cashier's check, their bid will be found non - responsive, Mr. Gilot added. * <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids were <br />referred to Solid Waste and Equipment Services for review and recommendation. <br />* (A bid security check from Kann Manufacturing was found by the Clerk in the envelope that <br />Kann submitted their bid in, after the meeting adjourned.) <br />OPENING OF BIDS — TWO (2) MORE OR LESS 2010 OR NEWER 33 CUBIC YARD SIDE - <br />LOADING REFUSE TRUCKS (SOLID WASTE RENTALS /CAPITAL LEASE PAYMENTS) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />BEST EQUIPMENT CO., INC. <br />5550 Poindexter Drive <br />Indianapolis, Indiana 46235 <br />Bid was signed by: Mr. Mike Dahlmann <br />Non - Collusion Affidavit was in order <br />Non - Discrimination commitment form was completed <br />Five percent (10 %) Bid Bond was submitted <br />no <br />Year <br />Make /Model <br />Unit Price <br />2011 <br />Freightliner with 2010 EPA Emissions <br />$221,865.00 <br />Option <br />Description <br />Total <br />1 <br />On board route optimization software and <br />hardware complete and ready to use for reading <br />RFID tags in refuse containers. <br />$51,420.00 <br />2 <br />Hand held route optimization software and <br />hardware complete and ready to use for reading <br />RFID tags in refuse containers. <br />$3,350.00 <br />Option Exception 1 & 2: <br />1. Hardware & Software is for Two Trucks Complete & Installed <br />2. Software for Hand -Held Unit is Included in The Truck Unit <br />Without Software Included in Truck Unit, Hand Held Cannot <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.