My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-10 Council Agenda & Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2010
>
10-25-10 Council Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 12:37:03 PM
Creation date
10/21/2010 11:04:47 AM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stadium Village Annexation Area 5 <br />SECTION III. MUNICIPAL SERVICES <br />A. Public Works <br />Sewer - A ten inch diameter public sanitary sewer was installed in Vaness Street during the <br />construction of the Stadium Village development. Four 6 inch diameter sewer taps were <br />included in that work. The Phase II development will use these taps to connect to the existing <br />sanitary sewer. Revenue from customers on this sewer will be sufficient to operate and <br />maintain the facility without burden to other ratepayers. <br />Water - The South Bend Water Works currently has a 6" main on the west side of Willis <br />Avenue that will provide sufficient capacity for the annexation area <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by I.C. 36 -9 -22- <br />2, I.C. 8 -1.5 -3 and 4, and the rules and regulations of the South Bend Water Works and <br />Sewer Utility. <br />Street Lighting - The developer of this property will be required to install a street lighting <br />system. Additional revenue to the General Fund from this annexation area will be sufficient to <br />pay for street light operations. <br />Waivers of Annexation -- No waivers of annexation. are in effect for the Annexation Area. <br />Streets _ No new public streets have been proposed for this development. Approximately 270 <br />feet of Willis Avenue will be annexed. Thus, 400 feet of the street will be within the City. <br />Maintenance of this street segment will be included in the working agreement between South <br />Bend and Saint Joseph County to share routine maintenance activity on boundary areas. <br />Drainage Plan - Drainage facilities will be required to be constructed by the developer and <br />meet the latest City of South Bend standards. <br />General Budget Analysis <br />2008 Actual Budget Report for the Department: <br />Expenditures: $6,303,240 <br />Miles of Roadway in City: @480 <br />Cost per Mile: @$13,131.75 <br />New Mileage within Area: @.007miles (feet) <br />Estimated Maintenance cost <br />for Annexation Area per year: @$92 <br />B. Police (Department <br />The Annexation Area would be expected to be added to the already existing BEAN 11. Police <br />patrols, traffic enforcement, and emergency responses will be part of the services the City will <br />offer to this area. This proposed annexation would require officers to cover a relatively small <br />additional area to this beat. <br />At this time it is not expected that this annexation would cause calls for service to increase <br />significantly and it is not anticipated that it will be necessary to increase police patrols beyond <br />
The URL can be used to link to this page
Your browser does not support the video tag.