My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(1) Refurbishment of 2020 S. Main
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
10-15-10 Packet
>
6D(1) Refurbishment of 2020 S. Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 9:49:54 AM
Creation date
10/13/2010 10:30:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 1, 2010 <br />City of South Bend <br />227 W. Jefferson Boulevard <br />South Bend, IN 46601 <br />Attention: Mr. Bill Schalliol <br />RE: PROPOSAL FOR REFURBISHMENT OF THE FORMER EMI, INC. BUILDING <br />AND GROUNDS LOCATED AT 2026 S. MAIN STREET, SOUTH BEND, <br />INDIANA 46501 <br />Dear Bill: <br />Wightman Petrie is pleased to submit this proposal to provide services for the property located <br />at 2026 S. Main Street, South Bend, Indiana 46601. This proposal includes an outline of our <br />understanding, our estimated fee and contractual information. <br />PROJECT UNDERSTANDING <br />The City of South Bend desires to enhance the building and grounds located at 2020/2026 S. <br />Main Street so that the City can provide the property as a location for new commercial <br />investment. Wightman Petrie and the City's Engineering and Redevelopment offices have met <br />multiple times concerning this site and we have come to the conclusion that the project involves <br />two (2) phases that will be awarded through a quote process. The first phase will begin in Fall <br />2010 and will concentrate on fixing the roof and walls of the building, removing all interior <br />improvements, machinery and debris. Included in this phase will be removal of the impervious <br />surfaces, drywells and fencing that surround the southern lot and regarding and planting with <br />hydroseed. Wightman Petrie is prepared to design this project, deliver stamped plans and <br />specifications, coordinate the quote process, provide design engineer guidance during the <br />project and also provide partial construction inspection during the length of the project. <br />The second phase consists of development of the lots north of the former EMI building into a <br />parking area, replacement of the curb and sidewalk along portions of Bowman Street, Main <br />Street and Donald Street and new landscaping along all tree lawns. This phase is scheduled to <br />be put out for quotes in Spring 2011. Wightman Petrie will provide similar services as above <br />and also include a replat of the site to incorporate the revisions of the northern lots. <br />WIGHTMA�TPETRIE <br />SURVFYINC: `NrIN(TRING FN11IRONMFN7.NI I.NNDSCAFT ARCI IITfCTUR.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.