My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(5) Resoltion No 2760
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
10-15-10 Packet
>
6C(5) Resoltion No 2760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 9:51:50 AM
Creation date
10/13/2010 10:29:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April, 2010 <br />City of South Bend <br />Jefferson Blvd. & Niles Avenue <br />Streetscape Modemization & Intersection Improvements Page 4 of 4 <br />APPENDIX B <br />Fees for Services & Schedule <br />FEES FOR SERVICES <br />Abonmarche will be paid the lump -sum amount of $120,000.00 for performing Tasks 1 <br />through 5 as described in Appendix A. Abonmorche will invoice the City on a monthly <br />basis for the percentage completed for each task. The following are the fees for the <br />various tasks: <br />Task # 1: Field Survey ................................................................ ............................... $ 24,900.00 <br />Task #2: Preliminary Design ................................................... ..............................$ 45,700.00 <br />Task#3: Final Design .............................................................. ..............................$ 42,400.00 <br />Task#4: Bid Period Services ................................................... ............................... $ 2,500.00 <br />Task#5: Construction Phase Services.... .............................................................. $ 4,500.00 <br />TOTALlump -Sum Amount .................................... ............................... ....................$120,000.00 <br />ANTICIPATED SCHEDULE <br />Task Estimated Completion Time <br />Task #1 Field Survey Within 45 days from Notice to Proceed <br />Task #2 Preliminary Design Preliminary draft within 75 days from <br />Notice to Proceed <br />Task #3 Final Design Within 45 days after the review <br />meeting of the preliminary plans <br />Task #4 Bid Period Services Within 7 days after bids are received <br />Task #5 Construction Phase Services Contractor construction period <br />NOTE: Tasks #2 and 3 are exclusive of the City's review time. <br />F: \Proposots \P thru T\S \South Bend Clty \Jefferson B!vd \tiles Ave to St. Pater \oppondLY 04-I5-tD.doc <br />Engineers Architects Planners <br />Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.