My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(3) Proposal for roof repair 237 N. Michigan
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
10-15-10 Packet
>
6C(3) Proposal for roof repair 237 N. Michigan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 9:52:17 AM
Creation date
10/13/2010 10:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SINGLE -PLY ROOF SYSTEMS CITY ROOFING, INC. MUSTRIAL ROOFING <br />MODIF® /BUILT -UP ROOF SYSTEMS Office and Yards — 2300 Sterling Avenue COMMERCIAL ROOFING <br />METAL ROOF SYSTEMS ELKHART. INDIANA 46516 ARCffiTECTURAL SHEET METAL <br />Phone (574) 295 -5100 <br />FAX (574) 295 -6890 <br />October 5, 2010 <br />Revised October 8, 2010 <br />CBRE / Bradley <br />202 S. Michigan Street <br />Suite 200 <br />South Bend, IN 46601 <br />Att: John L. Martell <br />Re: Roof Repair at the Old LaSalle Hotel Building <br />237 N. Michigan Street <br />SCOPE OF WORK: TO REPAIR THE BLACK RUBBER ROOF <br />MEMBRANE, AN APPROXIMATE AREA OF 10'X 64', WHICH HAS <br />BLOWN LOOSE FROM STORM DAMAGE. <br />1. Carry repair material up stairs to 9`h floor roof access door. <br />2. Replace missing pieces of wood fiber recovery board by attaching with screws & plates. <br />Pull back into place the existing rubber roof membrane. Install 6 "wide self adhering <br />reinforced securement strip down the middle of the 64'long open area. <br />4. Fully adhere the existing rubber roof membrane to the existing wood fiber recovery board. <br />5. Install screws and plates through the seams of rubber membrane of the area repaired. <br />6. Install over screws & plates through the seam, a 9 "wide rubber cover strip to <br />seal -off the new fasteners installed. <br />7. Carry all trash and debris, created by this repair, down the stairs and dispose off site. <br />The cost of the above described work is $ 2,500.00, which includes all labor, material, safety <br />equipment, trash disposal, and insurance required for this project. This proposal is good for <br />30 days and is subject to review thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.