Laserfiche WebLink
5 YEAR 15 -Aug -07 <br />Kendall Weiss,LL.P <br />�1.9�000.00 <br />South Bend Portage Township Residential Real Property Tax Abatement Schedule' <br />Estimated Project Cost: <br />Assessed Value: <br />STRUCTURE (assume 85% of project cost) <br />LAND (assume $10,000) <br />Gross Assessed Value <br />Less Mortgage Exemption <br />Less Standard Homeowners Deduction <br />Base Assessed Value <br />Less Maximum Abatement Deduction <br />Less Non- Abated Amount <br />Plus Land Assessed Value <br />Net Assessed Value <br />Property Taxes. <br />Assume constant tax rate of <br />Gross Tax (tax rate x net assessed value) <br />Less SRTC: 21.6906 %a <br />Less Homestead Credit: 32.0670% <br />Net Tax <br />Net <br />195000 <br />Total Taxes Tax Abated ** Tax Paid *'`* <br />165, 750.00 165, 750.00 165, 750.00 <br />10,000.00 NIA NIA <br />175, 750.00 165, 750.00 . 165, 750.00 <br />(3,000.00) (3,000.00) (3,000.00) <br />(35,000.00) (35,000.00) (35,000.00) <br />137, 750.00 127,750.00 127, 750.00 <br />NIA N/A (74,880.00) <br />NIA (52,870.00) N/A <br />NIA NIA 10,000.00 <br />137,750.00 74,880.00 62,870.00 <br />5.1524 % 5.1524% 5.1524% <br />7,097.43 <br />3,858.12 <br />3,239,31 <br />(1,539.48) <br />(836.85) <br />(702.63) <br />(1,782.27) <br />(968.83), <br />_ (813.44) <br />3,775.69 <br />2,052,44 <br />1,723.25 . <br />Total <br />*This schedule is for estimation purposes only and assumes constant tax rates. The true tax values <br />will ultimately be determined by the actual assessed valuation and the then current tax rates. <br />* *Tax Abated is capped at $74,880 of assessed value of structures only and does not include land <br />assessed value. <br />** *Tax Paid is calculated using the difference between actual assessed value of structure and <br />maximum abated portion of $74,880 and adding back the land assessed value. <br />Assessed <br />Taxes <br />Tax <br />Tax <br />Year <br />Value <br />Due <br />Abated <br />Paid <br />1 <br />137,750.00 <br />3,775.69 <br />2,052.44 <br />1,723.25 <br />2 <br />137,750.00 <br />3,775.69 <br />2,052.44 <br />1,723.25 <br />3 <br />137,750.00 <br />3,775.69 <br />2,052.44 <br />1,723.25 <br />4 <br />137,750.00 <br />3,775.69 <br />2,052.44 <br />1,723.25 <br />5 <br />137,750.00 <br />3,775.69 <br />2,052.44 <br />1,723.25 <br />5 year totals: <br />18,878.43 <br />10,262.19 <br />8,616.24 <br />*This schedule is for estimation purposes only and assumes constant tax rates. The true tax values <br />will ultimately be determined by the actual assessed valuation and the then current tax rates. <br />* *Tax Abated is capped at $74,880 of assessed value of structures only and does not include land <br />assessed value. <br />** *Tax Paid is calculated using the difference between actual assessed value of structure and <br />maximum abated portion of $74,880 and adding back the land assessed value. <br />