My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(2) Resolution No. 2778
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
10-01-10 Packet
>
6D(2) Resolution No. 2778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 9:33:25 AM
Creation date
9/29/2010 8:23:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ignition Park PUD Zoning Ordinance <br />Preliminary Plan <br />Date: September 27, 2010 <br />Petitioner: <br />City of South Bend Redevelopment Commission <br />Introduction <br />Petitioner. City of South Bend Redevelopment Commission. requests the rezoning of <br />approximately 84 acres from the CI - Ceneral Industrial District to the PUD -Planned Unit <br />Development District to provide for a hi~~h tech industrial park to be known as Ignition Park. <br />Ignition Park is intended to be a launching pad for technological innovation. Ignition Park. in <br />combination with Innovation Park. creates atwo-site, single. State Certitied Technology Park <br />within the City of South Bend. It is anticipated that development within Ignition Park may <br />include. but not be limited to: research and development facilities; education: office; prototyping <br />facilities; and. support uses. <br />The land uses to be contained within l~nition Park shall be those set forth below for each catego-y <br />identified on the Master Plan filed with this PUD petition. It is acknowledged that the Master Plan <br />filed with this PUD petition for I~~nition Park recommends general land uses for real estate which <br />is not subject to rezoning at this time and that the tinal development of Ignition Park in substantial <br />compliance with the Master Plan will be subject to Petitioner's ability to obtain zoning and <br />development rights to such additional real estate in the firture. The Master Plan does. however. <br />provide a framework from which to review the land use pattern p-•oposed for l~nition Park in -nuch <br />the same way as a Comprehensive Plan identities land use patterns for a community as a whole. <br />The Master Plan vision for Ignition Park is to provide for acampus-like setting within a single <br />multi-use PUD District. The primary objective of this PUD District is to encow•age development <br />which achieves a hi~~h degree of: (i) excellence in overall site design: (ii) integration of individual <br />parcel site design within the overall development: and. (iii) innovation. creativity and quality in <br />building design. The PUD District provides flexibility and procedural economy by permitting a <br />broad ranee of high-tech industrial land uses and related support uses in a sin~~le district. ~yhile <br />maintainingr adequate land use controls to protect adjoining properties. <br />In order to encourage innovative building and site designs capable of enhancing the duality of the <br />Ignition Park built environment. an applicant may propose alternate development standards for: <br />yards and bt-ildin~~ setbacks: use of minimwl~ yards and residential buf~eryards: maximum <br />building hei~~ht: minimum buildin~~ hei~~ht: maximum gross tloor area: parking_ loading: <br />outdoor operations: architecture: landscaping: lightin~~_ or. si~~ns. subject to approval by an <br />l~~nition Park Architectural Revie~~ Board and the Area Plan Commission. <br />Architectural Review Board and Executive Directo-- approval is required to establish any land use <br />or development within the lanition Park PUD. <br />13DDBOl ~,~39oes~-I Draft Date: September 27. ?010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.