My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009 Draft Budget without Circuit Breaker Cuts
sbend
>
Public
>
Finance
>
Budgets
>
2009
>
2009 Draft Budget without Circuit Breaker Cuts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2011 11:27:02 AM
Creation date
8/30/2010 3:13:56 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2009 BUDGET-No CB <br />2009 Budget DetailBudget Amount <br />2009 <br /> ENGINEERING <br />2008 Adopted <br />2007 <br />Request <br />Budget <br />101-0602-431.10-01 REGULAR$746,574 $808,824 $750,709 <br />2009 Text <br />1 CITY ENGINEER$73,440 <br />1 ASSISTANT CITY ENGINEER$67,238 <br />1 ENGINEER II ($63,115 X .50)$31,558 <br />1 PUBLIC CONSTRUCTION MANAGER$57,783 <br />1 G.I.S. MANAGER$53,836 <br />1 PROJECT INSPECTOR II$44,921 <br /> (1 PROJECT INSPECTOR II ELIMINATED)$0.00 <br />1 PROJECT INSPECTOR I$42,171 <br />1 PW SAFETY COORDINATOR (MOVED TO LIABILITY FUND)$0.00 <br />1 ENGINEER INSPECTOR$37,048 <br />1 PERMITS MANAGER$42,171 <br />1 SENIOR CAD SPECIALIST$42,171 <br />1 SENIOR G.I.S. SPECIALIST$43,593 <br />1 CUSTOMER SERVICE COORDINATOR$37,048 <br />1 LOCATOR$36,734 <br />1 LOCATOR$36,734 <br />1 SECRETARY OF THE BOARD$38,950 <br />2 SECRETARY V @ $29,077$58,154 <br />.09 DIRECTOR OF PUBLIC WORKS ($79,544 X 9%)$7,159 <br />101-0602-431.10-03 SEASONAL & INTERNS$30,360 $36,960 $36,960 <br />2009 Text <br />7 INTERNS (@ $11/HR X 480 HRS X 7 EMP)$36,960 <br /> 2 ADDITIONAL INTERNS ADDED TO WORK WITH THE$0.00 <br /> DOWNSPOUT DISCONNECT PROGRAM$0.00 <br />101-0602-431.10-04 EXTRA AND OVERTIME$7,594 $12,000 $0.00 <br />2009 Text <br />OVERTIME ELIMINATED$0.00 <br />101-0602-431.10-05 TEMPORARY SERVICES$3,487 $5,000 $5,000 <br />2009 Text <br />101-0602-431.11-01 FICA - REGULAR$58,972 $65,419 $61,175 <br />2009 Text <br />ENGINEERING$0.00 <br /> REGULAR $750,709$0.00 <br /> SEASONAL $36,960$0.00 <br /> OVERTIME $12,000$0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.