Laserfiche WebLink
item in the Engineer's estimate so as to be included in the maintenance bond for that <br />said sub-division. <br />Section 17-122. Erosion and Sediment Control Plan <br />(a) Plan Requirements <br />1. A 1 "=200' topographic, natural resources, base map identifying soils, existing <br />surface water drainage, current land use (including existing structures), locations of <br />roads, utilities, and easements, and significant man-made and natural features not <br />otherwise shown. <br />2. Two (2) sets of full size and one (1) set of 11" X 17" plans of the project site (Can <br />be on multiple sheets) including the legal description and location of all lots and <br />proposed site improvements. These plans should also show proposed locations of <br />soil stockpiles, borrow, and/or disposal areas. <br />3. A sequence of construction for the development site, including stripping and <br />clearing, rough grading, construction of utilities, infrastructure, and buildings, and <br />final grading and landscaping. Sequencing shall identify the expected date on which <br />clearing will begin, the estimated duration of exposure of cleared areas, the <br />installation of temporary erosion and sediment measures, and establishment of <br />permanent vegetation. <br />4. Seeding mixtures and rates, types of sod, method of seedbed preparation, expected <br />seeding dates, type and rate of lime and fertilizer application, and kind and quantity <br />of mulching for both temporary and permanent vegetative control measures. <br />5. Hydrologic and hydraulic design calculations for the pre-development and post- <br />development conditions of the site. <br />6. A maintenance and repair plan that includes detailed procedures to insure the <br />continued function of all control facilities, including easements and the estimated <br />cost for the periodic inspection of all control facilities. <br />7. Along with the above guidelines the Erosion and Site Control Plan shall meet 327 <br />IAC 15-5 and Article 12 of the City of South Bend Municipal Code Construction Site <br />Storm Water Runoff Control Requirements. <br />(b) Modifications to the Plan <br />1. Major amendments to the Erosion and Sediment Control Plan shall be submitted <br />to the City of South Bend Division of Engineering and shall be processed and <br />-6- <br />