My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(8) Brownfields Grant Agreement - former Studebaker Stamping Plant
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
07-23-10 Packet
>
6D(8) Brownfields Grant Agreement - former Studebaker Stamping Plant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 10:07:30 AM
Creation date
7/21/2010 9:38:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
samples will be analyzed for the area - specific COCs in accordance with U.S. EPA Method 6010 <br />(for lead); VOCs in accordance with U.S. EPA Method 82601IN Method 5035; TPH in <br />accordance with U.S. EPA Method 8015M; and /or SVOCs in accordance with U.S. EPA Method <br />8270 as appropriate. Rush turnaround times will be requested on laboratory analyses to allow <br />for expeditious decisions as to whether additional excavation is necessary, or whether the <br />excavations may be backfilled. <br />Should laboratory results of the initial confirmatory soil samples suggest that additional <br />excavation is necessary, Hull will coordinate with the excavation contractor to excavate and <br />dispose of additional soils as appropriate. Additional confirmatory samples will be collected in <br />the vicinity of any additional excavation to confirm that soils remaining at the Site meet Cleanup <br />Goals . <br />The horizontal and vertical extents of all excavations will be measured and surveyed using GPS <br />coordinates prior to backfilling. <br />Following receipt of laboratory analyses indicating that Cleanup Goals for COCs have been met, <br />the excavation will be backfilled to grade with clean fill material similar to the surrounding soils. <br />Compaction standards will not be specified. The excavated areas will then be capped with a <br />layer of topsoil and seeded. <br />3.4 Data Management <br />Because the excavation will likely be completed within several weeks, quarterly reports are not <br />anticipated. Following completion of the excavation, a soil remediation completion report will be <br />prepared and submitted to the City, U.S. EPA, and the Indiana Brownfields Program. <br />The report will generally follow the requirements of IDEM's RISC User's Guide and will include a <br />background of the Site, a description of the remedial actions completed at the Site, confirmatory <br />sampling results (including a comparison to Cleanup Goals), a description of the activities <br />completed to restore the Site to grade, and conclusions /recommendations as appropriate. <br />3.5 Proiect Schedule <br />The anticipated project schedule is as follows: <br />1) Approval of Soil Remediation Work Plan by Indiana Brownfields Program — month 0; <br />HULL & ASSOCIATES, INC. S61062.400.0003 <br />INDIANAPOLIS, INDIANA 6 JULY 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.