My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(1) Proposal for Phse II Site Assessment
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
07-23-10 Packet
>
6D(1) Proposal for Phse II Site Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2010 9:09:16 AM
Creation date
7/21/2010 9:09:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 groundwater samples for analysis of VOCs @ $85/sample $ 340 <br />4 groundwater samples for TPH-ERO @ $50/sample $ 200 <br />Terra Core Sampling Kits for collection of soil samples (15 kits @ $15/kit) $ 225 <br />p g 900 <br />Re ortin <br />ESTIMATED COST $4,745 <br />Please note that this ESTIMATED COST should be considered a Project Maximum, <br />which PES will not exceed without prior approval. However, should the scope of <br />services require modification (i.e., additional borings) based upon field conditions and/or <br />circumstances that would not have otherwise been anticipated, PES will notify the client <br />of such "changed conditions" and resultant cost implication to the project. <br />LIMITATIONS/QUALIFICATIONS <br />The sampling and testing of soil, groundwater and/or other materials not specifically <br />identified in this proposal is beyond the scope of services for this project. Cost estimates <br />for our proposed services have been prepared based on the following assumptions: <br />• PES will have unlimited access to the site during daylight hours; <br />• Interior areas identified for borehole installations will be cleared to allow for sufficient <br />access for equipment <br />• No subsurface obstructions (buried utilities or fill debris) will interfere with our work; <br />• Sufficient access/clearance will be provided for exterior Geoprobe locations; <br />• Groundwater will be encountered within 30-feet of ground surface; <br />• Inclement weather will not interfere with the completion of our field work; <br />• Soil cuttings and purge waters will be returned to the boring from which they were <br />generated, with the remainder of the boring filled with bentonite pellets to land <br />surface; <br />This Phase II Environmental Assessment should be considered as a "tool" in the <br />evaluation of the subject site relative to the potential presence of contaminants, and <br />does not necessarily fulfill Indiana Department of Environmental Management (IDEM) <br />guidelines for delineation of contaminants identified within soil or groundwater. <br />AUTHORIZATION <br />Phifer Environmental Services, Inc. appreciates the opportunity to be of service on this <br />project. Should you have any questions or require additional information, please contact <br />me at (574) 968-7191. Please acknowledge acceptance of this proposal by signature, <br />where indicated, as authorization for PES to proceed. <br />Sinc ly, <br />` Conley B. Phifer, CHMM <br />Phifer Environmental Services, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.