Laserfiche WebLink
Jul 03 07 11:41a DRNC".HRRNER a RSS. 574 ''34-4119 p.4 <br />14. Signage for the proposed project shall consist of not more than Two (2) <br />monument type signs, limited to One (1} sign per street frontage, whose height <br />shall not exceed a 5-foot height, or exceed a length of 8 feet. Signs shall be <br />limited to a maximum 32 square foot of sign area. Said signs, if lighted, shall only <br />have external lighting. Location of the signs shall not be closer than 1 foot to any <br />right-of--way line. All required safety sight distances at corners shall be <br />maintained as required by City codes/standards. Sign along Sorin Street frontage <br />nay be incorporated into shown masonry wall. <br />15. Security site lighting shall be limited to a combination of building wall pack <br />lighting and or light poles. Said poles shall be limited in height to 20 feet. All <br />lighting for security shall be shielded and directed downward to prevent off-site <br />light spillage. Maximum foot-candles at property boundary shall not exceed 3 <br />foot-candles per square foot or as allowed by City Zoning Codes, which-ever <br />restriction is greater. Maximum wattage shall not exceed 1,000 watts. Said lights <br />shall also be full-cutoff lights. <br />16. ~frash encloswes shall be required and shall be screened on a minimum of three <br />(3) sides with the same materials or combination of materials used for building <br />facades. Enclosures shall be placed no closer than ~ feet to a common interior <br />property line, nor closer than 3 feet from an alley right-of--way line as shown. All <br />enclosures shall have a screened gate, to screen view into said structwe. <br />17. Access to the Public alley shown along the West line of the project site shall be as <br />approved by the Board of Public Works. Any required Alley improvements to <br />allow said access shall be at the Developers'/Owners expense. <br />18. Any encroachment into Public Right-of--way (i.e. By landscaping or structures) <br />shall be approved by the Board of Public Works. <br />19. This project anticipates development in three (3) Phases. The first Phase would be <br />the North Building, the second Phase would be the South Building and the final <br />Phase would be the West Building. Construction of the project is anticipated to <br />begin within 8 months of approval, with favorable market conditions. <br />~i~~C~ X11 ~~ml°~'~ ~~ICB <br />J U ~ - 3 2007 <br />