Laserfiche WebLink
Ill. Section B of Appendix "A" is modified as follows: <br />B. The Projec#, as described herein, shaE! consist of preparing preliminary/grade <br />review design (38°{0 20% complete plans) for the following: <br />IV. Section C of Appendix "A" is modified as follows: <br />C. The ENGINEER will prepare ~a~ conceptual (38°~ 20% complete) traffic <br />signal plans at the following intersections: <br />V. Section D of A~endix "A" is modified as follows: <br />D. The ENGINEER will prepare pe~linaifla~~conceptua/ (38°~e 20% complete) traffic <br />signal mod cation plans at the following intersec#ions: <br />VI. Section ~. of Appendix "A" is modified as follows: <br />L. The ENGINEER shall prepare preliminary (~8~6-seed 25% roadway signing <br />design and plans for this project. Ali signing will be in accordance with the <br />Indiana MUTCD. Overhead signage will be desig~aed modifred for the lane <br />drops along northbound Michigan Street. <br />VII. Section M of Appendix "A" is deleted in its entirety: <br />M. Not Used. <br />VIII. Section O of Appendix "A" is modified as follows: <br />O. The ENGINEER shall identify areas where land acquisition would be required to <br />construct the project. If requested by the OWNER, the ENGINEER shall obtain <br />title abstracting and shall prepare plats and legal descriptions for up to a-8 6 <br />parcels. <br />lX. Add Section R to Appendix "A" as follows: <br />R, the ENGINEER shall prepare construction plans for the items described <br />below (Bid Packages 1 8 2) (see Figure 2). The Bid Package 7 shall consist <br />of improvements along the streets including but not limited to pavement <br />replacement new curb, sidewalks, tree lawns, imgation system and <br />electrical services. New curb and gutter will be provided on Madison and <br />Lafayette Streets. Bid Package 2 shall consist of converting the block <br />bounded by Michigan, Main, LaSalle and Madison Streets into a <br />consolidated parking lot The parking lot shall not include the Burger King <br />Properly located in the northeast corner of the intersecfion of Main Street <br />and LaSalle Street All the scope items described below maybe tailored as <br />necessary to meet the construction budget of $3,450,000.00. <br />2of13 <br />Supplemental Agreement No. 1 <br />