My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(1) Resolution No. 2670
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
04-23-10 Packet
>
6A(1) Resolution No. 2670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 10:51:44 AM
Creation date
4/20/2010 3:49:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April, 2010 <br />City of South Bend <br />Jefferson BNd. 8 Niles Avenve <br />Streetscape Modernization & Intersection Improvements Page 4 of 4 <br />APPENDIX B <br />Fees for Services tr Schedule <br />Abonmarche will be paid the lump-sum amount of $120,000.00 for performing Tasks 1 <br />through 5 as described in Appendix A. Abonmarche will invoice the City on a monthly <br />basis for the percentage completed for each task. The following are the fees for the <br />various tasks: <br />Task # 1: Field Survey ............................................................................................... $ 24,900.00 <br />Task #2: Preliminary Design .................................................................................$ 45,700.00 <br />Task #3: Final Design ............................................................................................ $ 42,400.00 <br />Task #4: Bid Period Services .................................................................................. $ 2,500.00 <br />Task #5: Construction Phase Services .................................................................. $ 4,500.00 <br />TOTAL Lump-Sum Amount .......................................................................................$120,000.00 <br />ANTICIPATED SCHEDULE <br />Task Esflmat~d Compl~fion TtrrM <br />Task # 1 Field Survey Within 45 days from Notice to Proceed <br />Task #2 Preliminary Design Preliminary draff within 75 days from <br />Notice to Proceed <br />Task #3 Final Design Within 45 days after the review <br />meeting of the preliminary plans <br />Task #4 Bid Period Services Within 7 days after bids are received <br />Task #5 Construction Phase Services Contractor construction period <br />NOTE: Tasks #2 and 3 are exclusive of the City's review time. <br />F:\Proposals\P tFvu T\5\SOUth Bsrid Clfy\Je}ferson Blvd\NNes Ave to st. Peter\appsndbc04-1 S10.doc <br />Engineers Architects Planners <br />Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.