Laserfiche WebLink
April, 2010 <br />City of South Bend <br />Jefferson BNd. 8 Niles Avenve <br />Streetscape Modernization & Intersection Improvements Page 4 of 4 <br />APPENDIX B <br />Fees for Services tr Schedule <br />Abonmarche will be paid the lump-sum amount of $120,000.00 for performing Tasks 1 <br />through 5 as described in Appendix A. Abonmarche will invoice the City on a monthly <br />basis for the percentage completed for each task. The following are the fees for the <br />various tasks: <br />Task # 1: Field Survey ............................................................................................... $ 24,900.00 <br />Task #2: Preliminary Design .................................................................................$ 45,700.00 <br />Task #3: Final Design ............................................................................................ $ 42,400.00 <br />Task #4: Bid Period Services .................................................................................. $ 2,500.00 <br />Task #5: Construction Phase Services .................................................................. $ 4,500.00 <br />TOTAL Lump-Sum Amount .......................................................................................$120,000.00 <br />ANTICIPATED SCHEDULE <br />Task Esflmat~d Compl~fion TtrrM <br />Task # 1 Field Survey Within 45 days from Notice to Proceed <br />Task #2 Preliminary Design Preliminary draff within 75 days from <br />Notice to Proceed <br />Task #3 Final Design Within 45 days after the review <br />meeting of the preliminary plans <br />Task #4 Bid Period Services Within 7 days after bids are received <br />Task #5 Construction Phase Services Contractor construction period <br />NOTE: Tasks #2 and 3 are exclusive of the City's review time. <br />F:\Proposals\P tFvu T\5\SOUth Bsrid Clfy\Je}ferson Blvd\NNes Ave to st. Peter\appsndbc04-1 S10.doc <br />Engineers Architects Planners <br />Surveyors <br />