My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/10 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2010
>
03/22/10 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2010 3:30:25 PM
Creation date
4/14/2010 9:19:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MARCH 22, 2010 76 <br />30 Class A High Early Strength Concrete (Less <br />than 4 Cys} 1 CYS $92.50 $92.50 <br />31 Plowable Fill (More than 4 Cys) 1 CYS $55.25 $55.25 <br />32 Plowable Fill (Less than 4 Cys} 1 CYS $65.25 $65.25 <br />33 Supexflow Plowable Fill {More than 4 <br />CYS) 1 CYS $59.50 $59.50 <br />34 Su erflow Plowable Fill (Less than 4 CYs} 1 CYS $59.50 $69.50 <br />35 Demurs e Fee 1 MIN $1.50 $90.00 <br />Total Amount of Bid {Items 1 through 29) $679.50 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids were <br />referred to Engineering and the Street Department for review and recommendation. <br />OPENING OF BIDS -- INFORMATION TECHNOLOGIES STORAGE & VIRTUALIZATION <br />HARDWARE LEASE PROJECT - 2010 (IT CAPITAL) <br />This was the date set for receiving and opening of sealed bids for the above referred to project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be cuff dent. The following bids were opened and publicly <br />read: <br />CIDW GOVERNMENT,.LLC <br />230 North Milwaukee Avenue <br />Vernon Hills, Illinois 60061 <br />Bid was signed by: Ms. Maureen O'Connell <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment farm was completed <br />Ten percent {10%} Bid Bond was submitted <br />BID: <br />Item <br />No. <br />Qty. Item -price {per Unit) Price (extended) <br />1 2 NetApp FAS20~10-RS SAN $95,101.82 $190,683.63 <br />2 4 HP DL380 G6 Servers $7,147.00 $28,588.00 <br />Total Hardware Lease Cost $5,956.00 <br />Alternate Option: <br />NetApp FAS 2040-R5 SAN wl48 Month Support $101,48&.15 $203,452.30 <br />Lease Cost $6,308.00 <br />Notes: No. 1 - 35-Months/Price includes Shipping <br />Total Hardware Lease for 3 5 Months <br />Alternate Option Includes Shipping <br />Alt. Option Leas Cost for 35 Months <br />It was noted that there was na bid bond. Mr. Keith Crane, Information Technologies, stated he <br />would contact the company to see if they had included one. After contacting CDW, Mr. Crain <br />stated they had put a statement in their bid that the bid bond would be sent after the bid was sent. <br />The company faxed a copy of their bid band, and informed Mr. Crain that the original was in the <br />mail. Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids <br />were referred to Information Technologies for review and recommendation. <br />OPENING OF BIDS -ONE (1) OR MORE 2010.OR NEWER 3/4 TON._EXTENDED CAB <br />FOUR-WHEEL DRIVE 1?ICK-UP_TRUCK (SEWER DEPARTMENT CAP1TALl <br />This was the date set for receiving and opening of sealed bids far the above referred to project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />Caunty News, which were found to be sufficient. The following bids were opened and publicly <br />xead: <br />
The URL can be used to link to this page
Your browser does not support the video tag.