My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
test
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
04-09-10 Packet
>
test
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2010 11:01:51 AM
Creation date
4/7/2010 11:01:51 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
continue to make diligent efforts to obtain such financing for a period of sixty <br />(60) days after such request. If the Developer fails to obtain financing after <br />efforts listed above, then the Contract shall, at the option of the Commission <br />or the Developer, be terminated by written notice thereof to the other party, <br />and neither the Commission nor the Developer shall have any further rights <br />against or liability to the other under the Contract. <br />C. Termination by Commission Prior to Conveyance. <br />In the event that: <br />prior to conveyance of the Property to the Developer and in violation of the <br />Contract: <br />the Developer (or successor in interest) assigns or attempts to assign <br />the Contract or any rights therein or the Property, or <br />b. there is any change in the ownership of the Developer or with respect <br />to the identity of the parties holding partnership interest in the <br />Developer or the degree thereof, which the Commission reasonably <br />has refused to approve; or <br />2. the Developer does not submit reasonably satisfactory architectural and site <br />plans, or evidence of necessary equity capital and mortgage financing, in <br />satisfactory form and in the manner and by the dates respectively provided in <br />the Contract therefore; <br />then the Contract and any rights of the Developer in the Contract and the Property shall, at the option <br />of the Commission, without need of the consent of the Developer, be terminated: Provided, however, <br />that with respect to any default or failure referred to in subdivisions 1 or 2 of this Section IX, <br />Subsection C, a period of thirty (30) days shall be given to cure such failure or default after the date <br />of written demand by the Commission shall be given to cure such failure or default. <br />D. Reverting Title in Commission upon Happening of Event Subsequent to Conve ace <br />to Developer. If, subsequent to conveying any part of the Property to the Developer and prior to <br />completion of the Project as certified by the Commission: <br />1. the Developer (or successor in interest) shall default in or violate its <br />obligations with respect to the construction of the Project, including the <br />nature and the dates for the beginning and completion thereof, or shall <br />abandon or substantially suspend construction work, and any such default, <br />violation, abandonment, or suspension shall not be cured, ended, or remedied <br />within three (3) months [six (6) months, if the default is with respect to the <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.