My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/21/1924 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1924
>
10/21/1924 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:45:34 PM
Creation date
4/4/2018 11:21:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/21/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bids received opened and read on follweing imprro vements e - <br />Pipe sewer.on Mc�inley Avenue.froeSBn4pBide Ave=e to the east line of lot Seventy <br />in Sunnysde Manor Addition, Under Improvement Revolution No. 1441. Roceo Sixeri, <br />Hoban & Roach,& George Poxtarelli ( See files for original bids.) Contract awarded to <br />Rooco Simeri at price. bid. <br />Chicago, South Bend & Northern Indiana Ry. Company ordered to <br />repair tracks at Cushing.Street and Lincoln. Way West. <br />Petition filed for the grading of 23rd. Street from Mishawaka <br />.Avenue to Pleasant Street. Filed no action taken. <br />Petition and waiver filed for sewer on Madison Street from rest <br />line of Madison Park to east line of North Sunnysido Addition and Palmer Blvd. from <br />Sunnyside Avenue to East line of Madison Park. Resolution ordered. (`Insert see files <br />for watdvor and petition.) <br />Petition filed for light at corner. of Sunnyside Avenue and McKinley <br />Avenue. Referred to inspector for report. <br />In Re petition filed for light at corner -of Fellows Street and <br />Ecknan Street, no light necessary on account of Fellows Street not being graded and no <br />houses o) the east side of street, and a light being one block west and one block north. <br />petition denied. <br />Arc light ordered placed at northwest;corner Of Donald Street and <br />Vernon Street on a mast arm. <br />Partial estimates allowed as follows: - <br />Pavement on George Avenue fxnu uner Improvement Resolution No. 1287 <br />to Plumer Construction Company at.0...0..$5,354.32 _ <br />Pavement on Warren Street under.° Improvement Resolution No. 13699 <br />to Williston Construction Company at......$69&44.76 <br />Grade, curb and walk on Carlisle Street, under Improvement Resolution <br />No. 1297 to C. H. Eldred at ............... 1,880.29 <br />Arc light ordered reset to - the north about 150 feet to the pole <br />on the southwest corner of Diamond Avenue and Van Buren Street and use the sane mast <br />arm tka and remove the pole the light now stands on. <br />Contract of Wm. H. Burke for water eoa,nections on Kessler Blvd. <br />under Improvement Resolution No. 1435 adopted October 7th.0 1924 approved ( See files.) <br />Contract with C. H. Eldred as contractor for grade, curb and walk <br />on west side of College Street from Bull& Street to Keller Street as provided in <br />improvement Resolution No. 1437 adopted October 14th., 1924 signed and construction. <br />bond attaiched thereto in the sum .of $309.00 with Aetna Casualty & Surety Company <br />of ,Hartford Conn. as sureties, 'approved. Contract and . boad ordered filed. <br />Contract with -C. H. Eldred lei as contractor for grade, curb and walk <br />on East side of Brookfield Street from Keller Street to Bull& Avenue, as provided <br />in improvement Resolution No. 1436 adopted October 14th., 1924 signed and con- <br />struction bond attached thereto in the sus of $332.00 with the Aetna Casualty Company <br />of Hartford Conn.. as sureties as sureties approved. Contract and bond ordered filed.. <br />Contract with J. A. Barnes as contractor for grade, curb and walk <br />on Swygart Avenue from Prairie Avenue to Ewing Avenue as provided in improvement <br />Resolution No. 1311 adopted February 19th.9 19249 signed and construction pond <br />attached thereto, in the sum -of $2,949.00 with United States Fidelity & Guaranty <br />Company of Barlt,imore, Maryland as sureties approved. Contract and bond ordered filed. <br />Guarantee bond of The Albert Construction Company as contract <br />for the Sheet asphalt pavement on Taylor Street from Indiana Avenue to Calvert Street, <br />under Improvement Resolution No. 1334 adopted April 1st.9 1924 signed and the <br />Bond in the suet of $2,243.95 with the Ohio Casualty Company as sureties, approved. <br />Contract and bond ordered filed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.