Laserfiche WebLink
516 <br />Board met in regular session at 9:00 A.M. All members present. <br />Mr. A. Mattes took up matter of having poles replaced at the <br />corner of North Shore Drive and Leeper Avenue. Referred to Inspector for <br />,investigation'. <br />Harry N.-Barnes Contractor` requested that the sum of $1,000,00 <br />held upAugust,- 13th., on grade, ou.rh and walk 'Improvement on Washington AveNue <br />be released., This matter to be taken up Wednesday October 8th., 1924 at <br />-715 P.M-Glerk'instruoted to notify Claude Taylor to be present. <br />Engineer signed assessment rollsand'final estimates on the <br />following improvements: - <br />concrete pavement on alley )5etween Michigan Street and Main <br />Street from Broadway to Indiana Avenue, uride Improvement Res. No. 1378. <br />Pipe sewer on -Brookfield Street from Keller Street to Hamilton <br />St ohnson Street from Keller Street to Hamilton Street and O'Brien Street <br />from Keller Street to North line of Marquette Nlvd. and Marquette.Blvd. from <br />Brookfield Street to O'Brien Street. under Improvement Resolution No. 1269. <br />Sheet asphalt pavement on Dunham Street from Chapin Street <br />to McPhersori'Street also Laurel Street $eom Dunham Street to Fisher Street <br />under Improvement Re so lu t iorr No. 1284 <br />Assessment roll adopted and final estimates allowed, Notice <br />of adoption of the assessment rolls and of hearing upon the same on the 28Ad, <br />day of October 1924 at 7:15 P.M. ordered Published as provided by law. <br />Communica,;ion received fro% ,Board df Public Safety'requesting <br />that lightw be placed in alleys and streets. Referred to inspector for report. <br />Partial estimate allowed J. A. Barnes Contractor for Grade, cb <br />curb and walk on -Brookfield Street from Prairie Avenue to Ewing Avenue at <br />$29930.80. <br />One 400 C. P. Light ordered pleased at center of block on 25t4 <br />Street between Mishawaka Avenue and Hastings Street. <br />Building Dept. Financial report for themonth ofSept. 1924. <br />filed. ( See files,) <br />Excavation bond of W. S. Lodyga, Anton J. Swierski, E. H. <br />Arnold, W.-W. Sibley referred to City Engineer to b-e checked as towhether <br />work is being taken care of. . . <br />Guarantee of the Western Construction Company for South Main <br />Street) asphalt pavement with the Aetna, Casualty Company released. . <br />Petition filed for light on Blaine Avenue from Birner Street <br />to Harvey Street and Birner Street from Blaine Avenue to Allen Street. Referrd <br />to Inspector for report. <br />Indiana & Aichigan Elea. Co. ordered to remove guy wire attac <br />attached to tree at Corby Street between Arthur Street and Walsh Street o_ n <br />north side of Street. <br />Permission granted to the Indiana Bell Telephone Company <br />to place a 40 ft. pole in the alley south of Monroe Street, e&st"of Taylor <br />Street and see that pavement is satisfactorily repaired. <br />The following notice is hereby ordered sent to Jefferson <br />Hotel Company. <br />Attention Mr. Van Valkenburg. <br />You are maintaining a stairway <br />in the sidewalk on the Jefferson Blvd. side of your hotel. <br />These stairways ar* an eneroeh- <br />ment on City property, a nd_are being removed whever they have been built in the <br />business seetin of the City, as they are both an obstruction and a hazard. <br />May we ask that you take steps to have this closed_ without our issuing a formal <br />order for you U de So. <br />