4 -
<br />Board met in regular session at 9:00 A.M. All members present.
<br />Bids received and read as followse Fellows Street pavement unde
<br />Improvement Resolution No. 1414 Hoban & Roach, The Albert Construction Company,
<br />H. N. Barnes, Pavementon Chapin Street one under Improvement Resolution No. s
<br />141.5, 2oban & Roach, The Albert Construction Company, H.-N, Barnes, Pipe sewer on
<br />Brookfield Street u er Improvement Resolution No, 1412, Rocco Simexi, Geo, A.
<br />Harrop, L. H. Webster, S. U. Ackerman, C. E. Reesh. Pipe sewer on Almond Ct.
<br />under Improvement Restution No. 1413; L. H. Webster, Rocco Simeri, Hoban & Roach,
<br />( See files for original bids.} All.above bids referred to the 'City Engineer for
<br />-.,tabt itation to be .reported on Wednesday September 3rd.,1924 at 7:15 P.M.
<br />Are light ordered placed on the first alley north -of Hastings_
<br />Street and.34th. Street.
<br />No light necessary at'grant and Merry Avenue. Trees need trimmig
<br />do
<br />No light necessary on Studebaker Street between Colfax Avenue ad
<br />and Linden Avenue..Tree need trimming.
<br />Exchange 100 C. P. Light now at corner of Broadway and Marietta
<br />Street to a 300 C. P. Light and reset the pole to the corner.,
<br />In re petition signed by Dewsy Comer zxd et al in regard to set&
<br />setting poles on Linden Avenue between Carlisle Street and Sadie Street, upon
<br />investigation find that these poles are in proper place, but that buildings on th
<br />the east side of the alley as standing 3 feet ut in alley. Buildings ordered
<br />moved back on property line. Engineer's office zilk to furnish a list of names
<br />and notices to be served according to law.
<br />Release of Indiana Construction Company bond on Various Street
<br />grade, curb and walk improve)nents approved.
<br />Contract with L. H. Webster under Improvement Resolution. Np
<br />1.410 for pipe sewer on Francis Street from Howard Street, to a point 71 feed, south
<br />of St. Vincent Street adopted July 8th., 1924 signed and construction bond in the
<br />sum of $566.00 *with Hartford Accident and Indemnity company as sureties,
<br />approved, Contract and bond ordered filed.
<br />Contract with C, H. Eldred as ontractor for grade, curb and walk
<br />on Highland Blvd, from Delaware to Prdirie Avenue as provided in Improvement
<br />Resolution No. 1296 adopted February 12th., 1924 signed and construction bond
<br />attached thereto in the sum 'd: "ST,'>:06.00 with the Aetna Casualty and Surety
<br />Company of Hartford Conn, as sureties, approved. Contract and bond ordered filed.
<br />Contract with (C.-E. Reesh as contractor for pipe sewer on Rose
<br />Street from Portage Avenue to 25 Ft. southwesterly of the.northeasterly line of
<br />lot 23 Portage Heights Addition signed and construction bnd in the sum of
<br />$1,295.00 attached thereto with fttl The AetharCasualty and Surety Company as
<br />sureties approved. Contract and bona ordered filed.
<br />Contract with C. E. Reesh as contractor for pipe sewer on Rose
<br />Street from Portage Avenue to 25 feet southeasterly of the northeasterly line of
<br />lot 23 Portage Heigghts Addition signed and construction boned atta hed thereto
<br />in the sum of $744.00 with the Aetna Casualty and Surety Company as sureties,.
<br />approved. , and contract and bond ordered filed.
<br />Contract with Wm. H. Burke for wat;er'conneotions and extensions
<br />on Lincoln Way East from Washington Avenue to Sample Street.under Improvement
<br />'Resolution No. 1417 adopted July 29th. , 1924 approved and contract orde raid filed,
<br />Contract with Wm. H. Burke as contractor for water connections on
<br />Washington Avenue from Michigan Street to Lincoln Way East as provided in
<br />Resolution No. 1416 adopted Jwly•29,1924 approyed.and contract ordered filed.
<br />Contract with Wm. H. Burke for water connections on South Lafsyet
<br />Street from a point 445' south of,Bronson Street to Sample Street as provided in
<br />Resolution No. 1411 adopted July 16th., 1924 approved and contract ordered filed.
<br />Engineer signed assessment rolls and final estimates under
<br />the following improvements,
<br />trade, curb and walk on Dorothy Street from Prairie Avenue to
<br />Ewing Avenue, under Improvement Resolution No. 1361.
<br />Pipe sewer on Poland Street from Olive Street to Meade Street,
<br />under Improvement, Resolution No. 1327. L
<br />
|