Laserfiche WebLink
Tuesday Vity 27th., 1924, Continued. <br />Pavement on Fisher Street from Chapin Street to VoPherson St. <br />aid of Plummer Constr. Co. <br />GrOing per cu. yd. <br />3 inch Veedersburg Vertical Fibre Wire,Cuty <br />gravel base sand f I l ler: 2.55 <br />For asphalt filler per sq. yd. .15 <br />Colicezete pavement per sq. yd, _ 2.25 <br />8 inch condlAit pipe per lin ft. .90 <br />Storm grater inlets, each 12.50 <br />Marginal curb per,lin fti. .35 <br />Resetting inlets, each 3.00 <br />Resetting manhole covers, each 3.00 <br />Check $487.030 <br />Rid of HoL_an & Roach. <br />?Ia,lk per sq. ft. .20 <br />Curb per iin ft. .45 <br />Grading per cu. yd. ;95 <br />' 7 inch concrete pavement per sq. rd, 2.30 <br />8 inch conduit pipe per lin, ft. .7$ <br />Storm water inlets, each 9.00 <br />Resetting inlets, each 3.00 <br />Resetting manholes each 3.00 <br />Check $4 52.00 <br />Bid of Peith Riley Constr. Co. <br />Bid of W. J. Nees <br />Walk per sq. tt. <br />Curb per lin ft. <br />Grading per cu. yd. <br />Trinidad Asphalt per sq. yd. , <br />Mexican Asphalt per sq. yd. , <br />3 inch Veedersburg Block.on gravel base sq* yd. <br />3 inch "11 "" on . "" ConcHte base <br />Trinidad asph. Concrete per sq, yd. <br />Mexican "" ""' per sq. yd. <br />8 inch conduit pipe per-lin>ft. <br />Storm water inlets, each <br />Resetting inlets, each <br />Resetting manholes, each <br />Marginal curb per lin ft. <br />Curbing per.lin ft. <br />Grading per eu, yd. <br />No. 1. three inch wire out Veedersburg Block, <br />on six inch rolled gravel base sq. yd. <br />With Bituminous Filler , <br />With sand filler <br />8 inch conduit pipe•per'lin ft. <br />Storm water. inlets, -each <br />Marginal curb per lin ft,. <br />Resetting inlets, each <br />Resetting manholes each <br />Bid of While Construction Co. <br />Check $452.00 <br />Walk per sq. ft. ' <br />Curb per lin ft. <br />Grading per cu. yd. <br />Sheet asphalt Mexican per sq. yd. <br />Sheet asphalt Trinidad per sq. yd. <br />Asphaltic concrete Trinidad per sq. yd. <br />Asphaltic concrete Mexican per sq; yd; <br />8 inch oonduit pipe per tin ft. <br />Storm water inlets, each <br />Marginal curb per lin ft. <br />Resetting inlets, each <br />Resetting manhole covers, each <br />Check $452.00 <br />.20 <br />.60 <br />1.00 <br />2.96 <br />2 <br />055 <br />2.80 <br />2.40 <br />2.65 <br />1.00 <br />15.00 <br />3.00 <br />3.00 <br />.4n <br />.50 <br />.80 <br />2.64 <br />1.00 <br />13.00 <br />.40 <br />3.i0 <br />3.00 <br />.20 <br />.50 <br />.90 <br />2.71 <br />2.85 <br />2 .60 <br />2.46 <br />•90 <br />12.50 <br />.40 <br />3.00 <br />3.00 <br />