Laserfiche WebLink
Tuesday April 15, 1924. Continued. <br />a in conduit per lin ft <br />• Storin water inlets each <br />Marginal curb per lin ft <br />Reset inlets each <br />mnh&les <br />Certified check $365.00 <br />Bid of Plummer Construction Cc: . <br />Grading per ou yd <br />" 3 in vertical. fibre Veedersburg brick, gravel base, <br />sand filler, per sq yd <br />• For asphalt filler add per sq yd <br />Concrete -pavement par sq yd <br />• 8 in -aon uit per l in ft <br />•, Storm water inlets each <br />No bid for re ettininlets a d manhole covers <br />lertiffed check 385.00 <br />Bid of W. J. Lang Construction Co: <br />Grading per ou yd <br />Sheet asphalt, Mexican, per sq yd <br />Natural Lake add per sq yd <br />8 in conduit per lin ft d <br />1.00 <br />15.00 <br />.40 <br />3.00 <br />3.00 <br />1.00 <br />2.55 <br />.15 <br />2.34 <br />1.00 <br />12.50 <br />1.85 <br />2.71 <br />.15 <br />.80 <br />2.51 <br />Asphaltic concrete per sq w 25.00 <br />storm water inlets each <br />• Certified check $385.00 <br />The following bids received on Johnson Street from Washington Avenue to <br />Lincoln -Way Nest: <br />Bid of Williston Construction Co: <br />Curb per lin ft <br />Grading per ou yd <br />Sheet asphalt, Mexican, per sq yd <br />isphaltie concrete, Mexican, per sq yd <br />8 in conduit per lin ft <br />Storm water inlets each <br />Marginal curb per lin ft <br />Resetting inlets each <br />manhikes <br />Certified check $1480.00 <br />Bid of White Construction Co: <br />Walk per sq ft <br />Curb per lin ft <br />Grading per ou yd <br />Sheet asphalt, Trinidad per sq yd <br />Asphaltic concrete, Trinidad, pe4 sq yd <br />Mexican <br />8 in conduit pipe per lin ft <br />Storm water inlets each r <br />Marginal curb per lin ft <br />]Reset inlets each <br />manholes .e <br />Certified checki480.00 <br />Bid of Rieth Riley Construction Co: <br />Walk per sq ft <br />. - " • Curb p.ar lin ft <br />Grading per ou yd <br />Sheet asphalt, Mexican, per sq yd <br />Trinidad <br />Veedersburg brick, sand filler, per sq ravel base per sq yd <br />bituminous filler, g <br />concrete base, add per sq yd <br />Concrete pavement• per• sq yd- <br />Asphalti6 concrete, Mexicans per sq yd <br />Trinidad <br />Storm water inlets each <br />Marginal curb per lin ft <br />Reset inlets each <br />manholes <br />Certified check $1480.89 " <br />Bid 60 Plummer Construetian Compainy: <br />Curb per lin ft <br />Grading per cu yd ravel base, <br />3 in vertical fibre Veedersr�urg brick, g <br />For asphalt filler add per sq yd . <br />Concrete pavemnat per sq yd <br />8 in conduit, per lin ft <br />Storm- waster inlets complete <br />.50 <br />1.00 <br />2.65 <br />2.40 <br />.85 <br />14.00 <br />.40 <br />3.00 <br />3.00 <br />.20 <br />.50 <br />.85 <br />5 <br />2.6S <br />2.82 <br />2.57 <br />2.43 <br />.85 <br />12.50 <br />.30 <br />3.00 <br />3.00 <br />.20 <br />.6o <br />1.00 <br />2.79 <br />2 .99 <br />2 65 <br />2.80 <br />.70 <br />2.40 <br />2.49 <br />2.69 <br />15.00 <br />.40 <br />3.00 <br />3.00 <br />.50 <br />1.00 <br />sand filler 2.60 <br />: 234 1.00 <br />12.50 <br />