Laserfiche WebLink
Tuesday April 15th, 1924. Contiru.ed. <br />B. I. Ritter was allowed the sum of /00.00 for. lot to be used for right of <br />way for sewer, River Park, District No. 3 <br />The Board optioned, reed and referred to the City Civil Engineer for Tabula- <br />tion, the following .bids: <br />Bid of H. N. Barnes for Pavement, 3-inch Brick on 6-inch rolled ravel base, <br />�sreet r: m^l wric ov,�y sue to Sancome Avenue, and on Sancome - Aven o from <br />on Van Buren° S <br />Linaroln Way West to California 4NE NIIE : $2.58 <br />Veedersbur§ ,bric;k per square Marti .15 <br />Add per square' yard for asphalt filler 1.00 <br />8 inch conduit pipe for lineal foot 10�00 <br />s Storm water inlets complete .30. <br />Marginal curb per lineal fo&i 2.00 <br />Resetting inlets each ach 3.00 <br />j Resetting manhole coverCe�fied Check!10.00 <br />Bid of H. N. Barnes for Pavement, 3 inch brick nn sic inch gravel base, <br />sand filler, -on Harris Street from Ford Street to Sample Street: <br />.50 <br />Cement surb per lineal foot 1.20 <br />Grading -to sub grade per cubic yard 2.60 <br />Veedersburg brick per square yard .15 <br />For asphalt filler add per square yard 1.00 <br />8 inch conduit pipe per lineal foot 10.00 <br />Storm water inlets complete each 30 <br />Marginal curb per lineal fo6t 2.00 <br />Resetting inlets each 3.00 <br />" manhole covers each <br />Certified Check - $283.00 <br />Bid of H.N.Barnes for pavement, three inch brick on six inch gravel base, <br />sand filler, on Kenwood Avenue from Johnson Street to Olive Street: .50 <br />Cement curb -per lineal foot 1.20 <br />• Grading per cubic yard 2.53 <br />• Veedersburg brick per square yard .15 <br />For asphalt filler add per square yard 1.00 <br />8 inch conduit pipe per lineal foot 10.00 <br />Storm water inlets complete .30 <br />Marginal curb per lineal foot 2.00 <br />Resetting inlets each 1 3.00 <br />ers each <br />Resetting manholes coCertified check-430.00 <br />Bid of H. N. Barnes on pavement of alley south of Division Street from <br />Franklin Street to WilliamS Street: <br />• 1.50 <br />Grading per cubic yard 2.70 <br />Concrete pavement per square yard 10.00 <br />Storm water inlets complete 2.00 <br />Resetting inlets complete each 3.00 <br />Resetting manhole covers each <br />Certified check - $100.00 <br />fillers on <br />Bid of H. N. Barnes.for pavalment, brick, six inch gravel base, sand <br />johnsaa street from Washington Avenue to Lincoln Way West .50 <br />Cement curb per lineal foot 1.20 <br />Grading sub grade Nor cubic yard 2_.52 <br />Veedersburg brick per square yard .15 <br />For asphalt filler add per square yard 1.00 <br />8 inch conduit pipe per lineal foot 10.00 <br />• Storm water inlets complete each 30 <br />Marginal curb per lineal foot 2.00 <br />Resetting inlets each 3.00 <br />Resetting manholes covers each <br />Certified Check - 11480.00 <br />Bid of Indiana Construction Company for pavement on alley south of <br />Division Street from Franklin Street to Taylor Street, concrete pavement. <br />Grading per cubic ward <br />Concrete paverd <br />Certifiedsquare <br />check 100.00 <br />7 inch concrete, on Corby Street <br />Bid of Hoban and Roach for Pavement, <br />from St. Loris Boulevard to South Bend Avenue: <br />Grading Per cubic yard <br />7 inch concrete alvement Per dquare <br />8 inch conduit pipe per lineal foot <br />Storm water inlets complete each <br />Resetting inlets each <br />hole covers each <br />yard <br />Resetting man <br />' Certifiec check-561.00 <br />1.35 <br />2.60 <br />1.35 <br />2.50 <br />1.00 <br />10.00 <br />3.00 <br />3.00 <br />