My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/1924 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1924
>
04/02/1924 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:22:07 PM
Creation date
3/29/2018 2:16:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/2/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br />Wednesday APril 2, 1924, 7:15 P.M. Continued. <br />I <br />Upon said hearing no remonstrators appeared and no written remonstrance was <br />filed. The Beard being fully advised in the premises, decides. that the benefits to property <br />liable to be assessed for said improvement are equal to the estimated cost of the same, as <br />rephr-tedby the City Civil Engineer,, and thereupon takes final action an said resolution <br />originally adopted and the same is hereby in all things ratified, confirmed and approved. <br />Resolved further, that notices be published on the 30th day 8f April, 1924, <br />a nd can the 7th day of 1h y ,- 19N , in the South Bend News Times and South Bend Tribune in said <br />4i,,y, slating that this Board will receive bids for the construction of said improvement up <br />t o 1D =0Q A .M. on the 20th day of , ley, 19e4 . The Beard reserves the right to re jest any and <br />11 bids . <br />Bearing bad on Improvement Resolution No. 1326 for Sikwer on Glenn Street from <br />Pro, it le Ave nue t o .the f irs t a lie y north of Ew ing Avenue in the C ity of South Bend, Indiana. <br />Upon said hearing no remonstrators 1ppe3red. and no written remonstrance was <br />filed be Board being fully advised in the premises, decides that the benefits to property <br />liable to be assessed for said improvement are equal to the estinnted cost of the same, as <br />re erted by the City Citil Engineer, and thereupon takes final action on said resolution <br />as orlgIns lly adopted and the same is hereby in all things ratified, confirmed and approved,. <br />Resolved further, that notices be published on the 30t1X day of April, 1924, <br />-and on: the 7th day of Yay, 19e4, in the South Bend News Times and South Bend Tribune in said <br />stating; that -this Board will receive bids for the construction of said improvement up <br />t`o 1'0:00 A.M. on the 20th day of May, 1922. The Board reserves the right to reject any and <br />all`bids. <br />l <br />Attest' ' <br />Clerk of Bard— &AeAtng Presipt — <br />Tuesday April 8th, 1924. _ <br />Board met in regular session at 9:00 A.M. All members present. Clerk of <br />the Board absent on account of sickness e <br />Mr; Hurwi" appeared at 9:30 and reported to the Board that, property on <br />South Lafayette Street was all cleared up. <br />This being the date set frr bids on River Park Trunk Sewer District No,, 31 <br />bids were received as follows: <br />Bid of George Pontftrelli for Trunk Sewer in River Park, District No. 3 <br />24 inch vitrified pipe per lineal febt <br />6.00 <br />4.80 <br />2 0 <br />18 " " n n n n <br />4.50 <br />15 <br />'-.75 <br />12 " n n n n n <br />2.45 <br />10 " " " <br />n.25 <br />8,n n n n <br />980 <br />6 n n n " n " <br />1.00 , <br />Tunne 1 6 inch for <br />7.00 <br />7.00 <br />Tunnel 8 inch <br />Reinforced Concrete Pipe (Leek point) <br />30 <br />indh <br />U.30 <br />n n <br />33 <br />inch <br />8.50 <br />36 <br />inch <br />12. 0. <br />42, <br />inch <br />11.90 <br />n o " <br />48 <br />inch <br />14.05 <br />54 <br />'inch <br />24.10 <br />n " " <br />72 <br />inch <br />46.15 <br />Manholes per foot in depth <br />10.00 <br />20.00 <br />Manholes; curbs.and covers each <br />Storm water inlets, complete, each <br />11.00 <br />2 Reinforced concrete junction chambers <br />eaeh2000.00 <br />12 feet of 42 inch cast iron outlet pipe <br />800.00 <br />or reinfroad concrete outlet pipe <br />1200.00 <br />Certified check $9375.00 <br />. Bid referred to Engineering Department to be tabulated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.