My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - WWTP Reuse Building Wall Repairs - Zimmerman Industrial Piping, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - WWTP Reuse Building Wall Repairs - Zimmerman Industrial Piping, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:17:33 AM
Creation date
3/28/2018 3:28:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: Wastewater Treatment Plant Reuse Building Wall Repairs <br />PROJECT NO. nla <br />QUOTES DUE March 27, 2018 <br />(Must be completed for all quotes. Please type or print) <br />Date: 3/26/18 Firm: Zimmerman Industrial Piping, Inc. <br />Address: 1117 N Clay <br />CitylState/Zip: <br />Mishawaka, IN 46545 Telephone Number: <br />574 1 259--3050 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Wastewater Treatment Plant Reuse Pump Station Wail Repairs <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated March 9, 2018 ] for the sum of (enter the Total Quote as shown on the Proposal) <br />Fifteen Thousand Six Hundred Thirty Two Dollars and no/100($ 15,632.00 <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attach nt. <br />By <br />Robert Kelsey (Sigre) <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of 20 <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President Suzanna M. Fritzberg, Member <br />Elizabeth A. Maradik, Member Therese J. Dorau, Member <br />James A. Mueller, Member Attest: Linda M. Martin, Clerk <br />Version 10/18/2016 Page - 1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.