My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/04/1927 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1927
>
10/04/1927 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:00:08 PM
Creation date
3/20/2018 11:45:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/4/1927
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r-r . <br />7 <br />Tuesday, October 4th., 1927. <br />Board met in regular session at 9 A. M. All members present. <br />Minutes of meetings held September 27th., and September 28th., <br />1927, read and approved. <br />The Board signed the contract and approved the construction <br />bond of E. T. Tranberg for the construction of grade, curb and walk` on Olive Street <br />from Bergan Street to Wilson Street under Improvement Resolution No.I935. The amount <br />of the contract being 2,288.54 and: the construction bond for 100% of the contract price <br />was signed`by the Employers Liability assurance Co. <br />The Board signed the contract with.Roe o limeri for the construct- <br />ion of local sewer in Orange Street from Olive Street to Meade treet under Improvement <br />Resolution No,I932. The amount of the contract being 1.965.30 and the construction bond <br />for 100% of the contract price was signed by the Columbia Casualty Co. <br />The Board signed the contract with John Lugaresi. for the <br />construction of a local sewer. on Dunham Street from Ka.ley Street to a point IO feet east <br />of the west line of Lot 964 Summit Place Addition under Improvement Resolution No.I933. <br />The amount of the contract being 568.60 and the construction bond for I00% of the <br />contract price was signed by the Employers Liability Assurance Corporation. <br />The Board approved the following Guarantee Bonds: <br />The Guarantee Bond of the Rieth Riley Construction Co., for the <br />C rroll Street pavement from Dayton to Milton Street under Improvement Resolution No. <br />I�88 signed by Souther Surety Company for 10% of the contract price of said improvement. <br />The Board approved the renewal certificate for the bond of <br />George D. Hartman in the amount of 5,000.00. <br />opened and read: This being the date set, the following bids were received, <br />Bid for the construction of grade and walk on High Street from <br />Dubail Avenue to Borman Street under Improvement Resolution No. 1936. <br />Eston Ball E. T. Tranberg Carl Zimmer Alex Bukowski <br />walk .I7 .I8 .I8 .I$ <br />curb .45 .50 <br />grading .90 .90 I.00 1.00 <br />Bids for the construction of concrete walk on Sample Street <br />from Walnut Street to Chapin Street under Improvement Resolution No.I938. <br />E. T. Tranberg <br />walk .I8 <br />curb 45 <br />Carl Zimmer Williston- Const. Co <br />.I7Q .I5 <br />Bids for the construction o pavement of the alley north of <br />Napoleon Blvd., from Leeper Avenue to the first alley east of Stanfield Street under <br />Improvement Resolution No.I9II. <br />! E. T. Tranberg Alex Bukowski Williston Co. <br />Marginal curb .40 .40 <br />grading I.00 I.00 I.00. <br />Concrete, light traffic 2.45 2.40 2.47 <br />asphaltic concrete 2.20 <br />storm water inlets x2x I2.00 <br />resetting inlets 3.00 <br />resetting man hole covers 3.00 <br />sewer connections I.00 <br />8 inch pipe I.00 <br />i <br />! Bids having been received for the pavement of the alley north <br />of Napoleon Blvd., from Leeper Avenue to the first alley east of Stanfield street under <br />Improvement Resolution No.I9II, the Board this 4th., day of October, I927, hereby makes <br />a preliminary order for concrete pavement as the type of pavement with said street shall <br />be improved and sets the I8tn. , day of 0 tob er I927, as the time when said Board shall <br />either pass on petition for a change of the type of pavement other than that specified <br />in the preliminary order, award the contract or reject all bids. <br />This being the date set, bids were received opened and read fo: <br />the construction of a local sewer on Wilber Street from'Lincoln �iay Best to Elwood Avenu <br />under Improvement Resolution No.I939. Bids as follms: <br />J. F. Hipskind J. Rothwell C. E. Reesh Geo. Harropp E. Dil <br />is" pipe 3.00 2.95 3.00 2.35 2.75 <br />I5" pipe 2.40 2.50 2.25 2.10 2.40 <br />I2" pipe 2.10 2..I0 1.80 I.95 I.90 <br />io <br />
The URL can be used to link to this page
Your browser does not support the video tag.