My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/27/1927 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1927
>
04/27/1927 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:39:13 AM
Creation date
3/15/2018 1:14:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/27/1927
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wedensday evening, A.,ril 27th. , I9271 <br />College_ Grove Add.; also from Brookfield. Street to a point 169.5 feet West of the <br />center line of Brookfield Street.; also from Grant Street to the alley west of <br />O'Brien Street. <br />Improvement resolutinn No.I798 for the consbuction of a local sewer in <br />and along Donald Street bzt een the alley east of leer Street anq Sampson Itreet. <br />In both of the above matters no remonstrators appeared and no written <br />remonstrance was filed and the Board being fully advised in the premises, finds <br />that the benefits to the property -liable to be assessed for said improvement are <br />equal to the estimated cost of same as reported by the City Engineer, and therefore:;;:. <br />declares said Improvement Resolutions No.1796 and No.I798 in all.things ratified, <br />comfirmed and approved. <br />In both of the above improvement resolutions, the Board orders that <br />on the I7th. , day of May, I927, this Board will receive, opene and consider sealed <br />proposals for the construction of said local sewers. Board further orders that <br />notices of said,proposals be published 6th., day of May, 1927 and on the 13th ., day <br />of May, I927, in the South. Bend News Times and Tribune, <br />This being the date set, hearing was had on .the Improvement Resolution <br />No.I794 for the construction of a local sewer in and along Johnson Street from <br />Hamilton Street to Wilson Street and Bergan Street from Johnson Street to Portage <br />Avenue. <br />In the above matter, remonstrators appeared and upon taking a mote, <br />the Board finds that there were fifteen property owners present who lived on the <br />streets, four of whom were against the improvement. The Board, therefore, decides <br />to continue hearing on same until May 4th., 1927, at 7-I5 P. If. <br />In the Resolution for the pavement on Dale Avenue from Donmoyer Avenue <br />to Oakside Street; and Woodside Street from ?'lest line of Lot 294 Charles Weidler"s <br />Second Addition to east line of lot 289, the property owners waived all objections <br />in and for the defense of said proceedings and to any violation in -the procedure' <br />for the construction of pavements as fixed by law. Thereupon the Board proceeds to <br />receive, open and consider sealed proposals for the construction of said grade, curb <br />walk and pavement under Improvement Resolution No.I817. Bids as follows: <br />Contractor C. Walk C. Curb C&G Concrete Inlets Reset. IN. Reset. It. H. 8" pipe <br />Twyckenham .I6 .38 .80 2.20 8.00 2.25 3.00 .80 <br />H. W. Reed .I5 .40 .70 2.10 I8.00 3.00 3.00 1100 <br />i <br />Harry Barnes .I5 .40 .70 2.00 $ 3.00 3.00 1.00 <br />Sheet Asp. Asp. Con <br />Williston .I5 .45 .75 2.40 2.�5 3.00 3.00 1.00 <br />All of the above bids handed to the City Engineer for tabulation. <br />i <br />City Engineer, Mr. H. G..Wray, filed plans, specifications and estimates: <br />and the Board adopted the following improvement resolutions: <br />i Improvement Resolution No.I826 for the construction of grade, curb and <br />walk on Falcon Street from Division Street to Jefferson Blvd. <br />Improvement Resolution No.I827 for the - construction of grade, curb and <br />walk on Wellington Street from Division Street to Jefferson Blvd. <br />Improvement Resolution No.I829 for the construction of grade, curb and <br />walk of Chicago Street from Division Street to. Jefferson Blvd. <br />Improvement Resolution.No.I828 for the construction of grade, curb and <br />walk on Illinois Street from Division Street to Jefferson Blvd. <br />I I Improvement Resolution No.I820 for the construction of grade, curb and <br />walk on Huey Street from Keller Street. to Marquette Blvd. <br />Improvement Resolution No.I8I9 for the construction of grade, curb and <br />walk on Oliver Street from Ewing Street to Donald Street. <br />Improvement Resolution No.I82I for the construction of Grade, curb and <br />walk on Kal ey Street from Elwood Street to Marquette Blvd. <br />Improvement Resolution No.I822 for the construction of grade, curb and <br />walk on Liberty Street from Division Street to Jefferson Blvd. <br />Improvement Resolution No..I823 for the construction of grade, curb and <br />walk on :Kentucky Street from Division Street to Jefferson Blvd. <br />• <br />• <br />Improvement Resolution No.I824 for the construction of grade, curb and • <br />walk on Iowa Street from Division Street to Jefferson Blvd.. <br />(Note: See files for copies of all of the above named resolutions.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.