My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/1927 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1927
>
03/22/1927 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:36:17 AM
Creation date
3/15/2018 12:28:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/22/1927
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
96 Tuesday, Yarch 22nd.. , 1927. <br />that the failure to file suchaffidavit is an irregularity under our statute and in <br />my judgement such bid should not be considered by you. <br />I also wish to say that I have been informed by the bidd.erts attorney <br />they have another reason, the bidder was disqualified from entering ento this contrac <br />for the construction of this work. As to this, I have not had time to investigate. <br />However, both defects are so serious that the bidder's attorney's have advised him to <br />withdraw his bid and check and this I understand has been done. <br />Trusting this furnishes the information desired, I am, <br />Very truly yours, ° <br />I. S. Romig, City Attorney." <br />The representatives of both the J. J. Dunnegan Constyuction_Oo., <br />and The Indiana funnel Construction Co-., appeared before the Board regarding the <br />awarding of the contract for same. After due consideration of the above mentioned <br />tabulations of bids -and ala&sis, the motion was made, duly seconded and unanimously <br />voted by the Board, to award the contract for the construction of the Northwbet <br />Trunk Sewer -to the J, J. Dunnegan Gonstruction Go., at their bid of 1,425,466.15 <br />for Reinforced Concrete Pipe,,without vitrified clay liner plate. Therefore, the <br />Board., this 22nd.. day of March, I927, hereby awards the contract for the construction <br />Of the Northwest Trunk Sewer to The J. J. Dunne Construction Co. at their low <br />bid of I,425,466.15. for reinforced concrete p pe, precast, their tid being the lowest <br />and best bid submitted. <br />Upon the approval of City Engineer, Mr. H. G. stray, the Board <br />approved the driveway for a Filing Station at the corner of Oswald Street and Walnut <br />Street. Also for a driveway for a Filing Station at the corner of La6alle Avenue <br />and Main Street. <br />Meeting adjourned. at I20101ock Noon. <br />attested: <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.