My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Ironwood Drive Pavement Rehabilitation Proj No 117-071A - C&E Excavating Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Award Bids
>
Award Bid - Ironwood Drive Pavement Rehabilitation Proj No 117-071A - C&E Excavating Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 11:41:50 AM
Creation date
3/14/2018 10:16:29 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF PUBLIC WORKS <br />CITY OF SOUTH BEND, INDIANA <br />PUBLIC WORKS CONTRACT <br />THIS AGREEMENT, made and entered into this 13th day of March, 2018, by and between, C&E <br />Excavating, Inc., 53767 County Road 9, Elkhart, IN 46514, HEREINAFTER called the <br />"Contractor", and the Board of Public Works herein called the "Board". <br />WITNESSETH: That the Contractor covenants and agrees to make the following improvement, <br />as fully .set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid <br />Proposal, all of which are set forth as a part of this Contract, for: <br />PROJECT NO.: 117-071A <br />DESCRIPTION: IRONWOOD DRIVE PAVEMENT REHABILITATION <br />COMPLETION DATE: SEE SPECIFICATIONS <br />AMOUNT: $1,347,592.50; BASE BID PLUS ALTERNATES A & B <br />FUNDING: LOCAL ROAD AND BRIDGE GRANT <br />The total bid for this improvement were those prices as received and accepted by the Board on the <br />February 27, 2018. <br />The Contractor further agrees to notify the Engineer when this improvement is completed. This <br />notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final <br />acceptance of the improvement by the Engineer, the Contractors final estimate will be presented <br />to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of <br />a Waiver of Lien. <br />BOARD OF PUBLIC WORKS <br />�Gar y A. Gilot Presiden E rtzAeth A. Maradik, Member <br />a <br />19r) <br />S 1, ymq 'P <br />u a <br />ritz <br />e g, <br />Mem <br />C&E EXCAVATING, INC. <br />Printed Name <br />A. Mueller, Member Signature <br />Therese J. Dorai'u,Member "Attest: Linda <br />Clerk <br />CERTIFICATION (To be completed if Contractor is a Corporation) <br />1, , certify that I am Secretary of the Corporation named as <br />Contractor herein; that who signed this Agreement on behalf of the Contractor <br />was then of said Corporation; that said agreement was duly signed for and in <br />behalf of said Corporation by authority of its governing body, and is within the scope of its <br />corporate powers. <br />Secretary Corporate Sea] <br />
The URL can be used to link to this page
Your browser does not support the video tag.