BASE BID
<br />Item
<br />^
<br />--Unit
<br />Na,
<br />Description
<br />Quantity
<br />unit
<br />_-ACFi
<br />trice
<br />Total Arnount
<br />27
<br />Rotr©fisted Tie Bars
<br />30,._._
<br />_
<br />--_.49
<br />$25.00
<br />$750.00
<br />28
<br />Sidewalk, Concrete, 4-1n.
<br />6__-.__SYS-�
<br />-SYS
<br />$35.60
<br />$17,657.60Y-
<br />29
<br />Sidewalk, Concrete, 6-in.
<br />17
<br />---
<br />$61.80
<br />$1050.60
<br />30
<br />Curb Ramp, Concrete, 6-in,
<br />115
<br />SYS
<br />_ _ _
<br />$112.00
<br />$12,880.00
<br />--
<br />31
<br />Detectable Warning Surface
<br />-�
<br />13
<br />_
<br />�-839 --
<br />SYS
<br />_
<br />_-.LFT -Y-
<br />$160.00
<br />$2080.00
<br />32
<br />Curb, Integral, Concrete
<br />T-
<br />---
<br />$30.50
<br />$25,589.50
<br />33
<br />PCCP for Approaches, 9-in.`
<br />58
<br />SYS
<br />$67.20
<br />- $3897.60
<br />34
<br />F-IMA for Approaches, Type C l -----
<br />--__-_
<br />18
<br />�'7G ^.�
<br />TON
<br />-
<br />$146.00 Y
<br />_..__ $2628.00 --
<br />----�.
<br />35
<br />_-
<br />Nursery Sodding
<br />--_._r
<br />--
<br />SY5-
<br />$9.80
<br />$744.80
<br />36
<br />Underdrains
<br />1,005
<br />LIFTY4YY
<br />$22.00
<br />$22,110.00
<br />37
<br />Pipe, 6-in.
<br />mm_ �
<br />8
<br />LF T
<br />$zz�oo
<br />$176.00
<br />38
<br />Pipe, 12-in.
<br />- -_ -
<br />�444
<br />-
<br />LFT
<br />--
<br />$28.04
<br />-
<br />$12,432.00
<br />39
<br />Pipe, 15-in,
<br />314
<br />LIFT
<br />$26.00
<br />$8164.00
<br />40
<br />Pipe, 18-in.
<br />154
<br />-_ LFT
<br />$28.00
<br />$4312.00
<br />41
<br />Connect to Existing Pipe or Structure _
<br />-_-7 - 4_
<br />u EACH
<br />$1500.00
<br />$10,500.00
<br />42
<br />Manhole, C-4
<br />G
<br />EACH
<br />$3800.00
<br />$22,800.00
<br />43
<br />Manhole, L-4
<br />_
<br />�EACf-1
<br />--------
<br />WEACH
<br />$3800.00
<br />$3800.00 v`
<br />44
<br />Inlet, B-15
<br />10
<br />� $3500.00
<br />$35,000,00
<br />46
<br />Inlet, C-15
<br />2_..___.
<br />F_ACHT
<br />$3600.00
<br />$7000.00
<br />-46
<br />Casting, Adjust to Grade -- -�_--Y
<br />5
<br />EACH
<br />$750,00
<br />$3750.00
<br />47
<br />Maintenance of Traffic
<br /># r
<br />LSUM
<br />$5075.00
<br />$5075.00
<br />48
<br />Construction Sign, A
<br />23
<br />-_
<br />EACH
<br />W $79.00
<br />�
<br />$1817,00
<br />49
<br />Construction Sign, B
<br />�------_____
<br />5
<br />_.._...___4 .._
<br />EACH
<br />$50.00
<br />--
<br />$250.00
<br />50
<br />Construction Sign, C
<br />EACH
<br />$125.00
<br />---
<br />$500 .00
<br />51
<br />Road Closure Sign Assembly
<br />2
<br />EACH
<br />$125.00
<br />52
<br />Temporary Pavement Marking,
<br />�LFT
<br />-$250.00
<br />-
<br />_
<br />Removable, 4-in. _ _
<br />#2,465
<br />$0.89
<br />$11,093.85
<br />53
<br />_
<br />Temporary Pavement Marking, Paint,
<br />2,745_-
<br />_
<br />--
<br />_
<br />LFT
<br />$0.38
<br />$1043.10
<br />54
<br />Temporary Pavement Marking,
<br />Removable, Lane Indication Arrow
<br />2
<br />EACH
<br />$70.00
<br />$140.00
<br />55
<br />Temporary Paven�snt Marking,
<br />Removable, 24-in,
<br />60
<br />LIFT
<br />$5,10
<br />$306.00
<br />56
<br />Detour Route Marker Assembly
<br />- 2`I
<br />EACH `
<br />mm�$89.00m----$1869.00
<br />Bidder (Firm):
<br />C & E Excavating, Inc.
<br />Version 1011712017 Contractor's Bid for Pulalir. Works - 8
<br />Revised Febwary 22, 2018 (Addend_ rra 1)