Project Name Ironwood Drive Pavement Rehabilitation and Intersection
<br />Project No.
<br />For Bids Due
<br />BASE BID
<br />117-071 A
<br />February 27, 2018
<br />Vi ACV.
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />I
<br />LSUM
<br />d4q,-20 6? 0 - Oo
<br />f44, avo- oo
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />�X) A0Q0 C)
<br />7 a00,00,
<br />3
<br />Clearing Right -of -Way
<br />1
<br />LSLJM
<br />4qqf 5-oo.00
<br />4
<br />Pavement Removal
<br />4,215
<br />SYS
<br />7. o 0
<br />5-1 ID 0
<br />5
<br />Curb and Gutter, Remove
<br />985
<br />LFT
<br />4 r7, C) C)
<br />6sq S: - oc)
<br />6
<br />Sidewalk, Concrete, Remove
<br />457
<br />Sys
<br />$7,00
<br />1 qq o o
<br />7
<br />Pipe, Remove Existing Storm Sewer
<br />856
<br />LFT
<br />$ 15w6 ()
<br />g q0
<br />8
<br />Structure, Remove Existing Storm
<br />Manhole
<br />11
<br />EACH
<br />4iso,o, o
<br />(0 5D
<br />9
<br />Pipe, Abandon Existing Storm Sewer
<br />100
<br />LFT
<br />10
<br />Excavation, Common
<br />1,116
<br />CYS
<br />11
<br />Borrow
<br />25
<br />CYS
<br />*Jq0 ou
<br />4L cc) ,Co
<br />12
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />, p C-0
<br />IS') 72)
<br />13
<br />Temporary Drop Inlet Protection
<br />29
<br />EACH
<br />196,oC>
<br />14
<br />Temporary Silt Fence
<br />732
<br />LFT
<br />15
<br />Subgrade Treatment, Type 1
<br />4,495
<br />SYS
<br />41 C),. 0 0,
<br />16
<br />Subgrade Treatment, Type 11
<br />125
<br />SYS
<br />fyo,(,01
<br />04000,
<br />17
<br />Subbase for PCCP
<br />11,116
<br />CYS
<br />$gloo
<br />L? 7 OV 06
<br />18
<br />HMA Patching, Type C
<br />TON
<br />0
<br />-4
<br />V? Sk
<br />19
<br />Milling, Asphalt, Transition
<br />355
<br />SYS
<br />20
<br />21
<br />Milling, Asphalt, 1.5 in.
<br />HMA Surface
<br />SYS
<br />e96
<br />TON
<br />4 7 Jp .,Sr34
<br />22
<br />HMA Wedge and Level
<br />100
<br />TON
<br />6 CC)
<br />49, C)
<br />23
<br />Joint Adhesive, Surface
<br />6,320
<br />LIFT
<br />24
<br />Asphalt for Tack Coat
<br />TON
<br />4; 35,
<br />25
<br />PCCP, 10-in,
<br />4,254
<br />SYS
<br />26
<br />26
<br />D-1 Contraction Joint
<br />2,050
<br />LFT
<br />47. S-0
<br />$16- -, Ob 1.376
<br />Bidder (Firm): Selcre ConstrugLion Co., Inc-
<br />Version 10/17/2017 Contractor's Bid for Public Works - 7
<br />Revised February 22, 2018 (Addendum 1)
<br />IM
<br />MW
<br />
|