Laserfiche WebLink
Project Name Ironwood Drive Pavement Rehabilitation and Intersection <br />Project No. <br />For Bids Due <br />BASE BID <br />117-071 A <br />February 27, 2018 <br />Vi ACV. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />I <br />LSUM <br />d4q,-20 6? 0 - Oo <br />f44, avo- oo <br />2 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />�X) A0Q0 C) <br />7 a00,00, <br />3 <br />Clearing Right -of -Way <br />1 <br />LSLJM <br />4qqf 5-oo.00 <br />4 <br />Pavement Removal <br />4,215 <br />SYS <br />7. o 0 <br />5-1 ID 0 <br />5 <br />Curb and Gutter, Remove <br />985 <br />LFT <br />4 r7, C) C) <br />6sq S: - oc) <br />6 <br />Sidewalk, Concrete, Remove <br />457 <br />Sys <br />$7,00 <br />1 qq o o <br />7 <br />Pipe, Remove Existing Storm Sewer <br />856 <br />LFT <br />$ 15w6 () <br />g q0 <br />8 <br />Structure, Remove Existing Storm <br />Manhole <br />11 <br />EACH <br />4iso,o, o <br />(0 5D <br />9 <br />Pipe, Abandon Existing Storm Sewer <br />100 <br />LFT <br />10 <br />Excavation, Common <br />1,116 <br />CYS <br />11 <br />Borrow <br />25 <br />CYS <br />*Jq0 ou <br />4L cc) ,Co <br />12 <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />, p C-0 <br />IS') 72) <br />13 <br />Temporary Drop Inlet Protection <br />29 <br />EACH <br />196,oC> <br />14 <br />Temporary Silt Fence <br />732 <br />LFT <br />15 <br />Subgrade Treatment, Type 1 <br />4,495 <br />SYS <br />41 C),. 0 0, <br />16 <br />Subgrade Treatment, Type 11 <br />125 <br />SYS <br />fyo,(,01 <br />04000, <br />17 <br />Subbase for PCCP <br />11,116 <br />CYS <br />$gloo <br />L? 7 OV 06 <br />18 <br />HMA Patching, Type C <br />TON <br />0 <br />-4 <br />V? Sk <br />19 <br />Milling, Asphalt, Transition <br />355 <br />SYS <br />20 <br />21 <br />Milling, Asphalt, 1.5 in. <br />HMA Surface <br />SYS <br />e96 <br />TON <br />4 7 Jp .,Sr34 <br />22 <br />HMA Wedge and Level <br />100 <br />TON <br />6 CC) <br />49, C) <br />23 <br />Joint Adhesive, Surface <br />6,320 <br />LIFT <br />24 <br />Asphalt for Tack Coat <br />TON <br />4; 35, <br />25 <br />PCCP, 10-in, <br />4,254 <br />SYS <br />26 <br />26 <br />D-1 Contraction Joint <br />2,050 <br />LFT <br />47. S-0 <br />$16- -, Ob 1.376 <br />Bidder (Firm): Selcre ConstrugLion Co., Inc- <br />Version 10/17/2017 Contractor's Bid for Public Works - 7 <br />Revised February 22, 2018 (Addendum 1) <br />IM <br />MW <br />